USAfixTM - Repair Guide (RG) - Master Email RG
- Test Solenoid
 Level of Difficulty - HIGH  Estimated Completion Time - 15 minutes
MINUTE - M-220024K17

Tools Required
Tool 
Volt meter (True RMS capable)

Parts Required


Step Procedure & Parts & Tools
1 LOCATE SOLENOID

2 PUT RED LEAD ON LEFT SOLENOID POST AND PUT BLACK LEAD ON ENGINE OR FRAME. TURN THE DIAL ON THE VOLT METER TO VOLTAGE (GENERALLY THIS IS A V SYMBOL)
Volt meter (True RMS capable)

3 VOLT METER SHOULD READ 12V. IF IT READS LESS THAN 11V, SOLENOID IS BAD.
Volt meter (True RMS capable)