- Commonly Asked For Parts

#PartDescription ReqNotesAvailability
01 252-1343 Electrode kit usually ships 1-5 days
02 252-0073 Axle 30 inch                                                 usually ships 1-5 days
03 252-1345 Igniter usually ships 1-5 days
04 177-0432 Key For Honda GX390 K1QNR2 usually ships 3-10 days
05 252-0272 Seal kit usually ships 1-5 days
06 162-0114 12V 50Ah AGM battery usually ships 18-19 days
07 177-0502 Starter motor usually ships 1-5 days
08 225-0450 Fuel filter usually ships 10-13 days
09 177-0483 Air cleaner element usually ships 3-10 days
10 177-0498 Outer filter usually ships 1-5 days
11 177-0418 Spark plug usually ships 1-5 days
12 177-0400 Starter grip usually ships 1-5 days
13 177-0497 Recoil starter rope usually ships 1-5 days
14 252-2019 Plunger kit usually ships 1-5 days
15 252-2048 Oring usually ships 1-5 days
16 252-1544 Fuel cap usually ships 1-5 days

Control Panel Assembly

#PartDescription ReqNotesAvailability
1a 225-0451 Thermostat 1 usually ships 10-13 days
1b 252-1139 Corrugated 1/4 inch conduit                                  66 in usually ships 1-5 days
2 252-1664 Control panel cover 1 usually ships 10-13 days
3 252-0114 Screw 10/32 inch x 1/2 inch                                  1 usually ships 1-5 days
5 252-1663 Locknut 1 usually ships 1-5 days
6 252-1191 Green 12V indicator light (OBSOLETE) 1 usually ships 14-20 days
7 252-0112 Nut cage 10/32 inch x 16 gauge                               6 usually ships 1-5 days
8 252-1665 Control panel decal 1 usually ships 10-13 days
9 252-1644 Hour meter 1 usually ships 1-5 days
10 252-1199 Curvette switch (OBSOLETE) 1 usually ships 14-20 days
11 252-1181 Strain relief, 1/2 inch                                      2 usually ships 1-5 days
12 252-1667 Strain relief 1 usually ships 14-20 days
13 252-1668 Control panel box 1 usually ships 1-5 days
14 252-1669 Flange nut 2 usually ships 1-5 days
15 252-1223 Bridge rectifier 1 (SGP-353037E and SGP-403537E) usually ships 1-5 days
16 225-0453 12V relay 1 usually ships 10-13 days
17 252-0104 Run capacitor 1 (SGP-303037 and SGP-353037) usually ships 14-20 days
18 252-0124 Capacitor bracket 1 (SGP-303037 and SGP-353037) usually ships 1-5 days
19 252-1222 Nut 10/32 keps 8 usually ships 1-5 days
20 252-1671 Screw 6-32 x 3/8 2 (SGP-303037 and SGP-353037E) usually ships 1-5 days
21 252-1672 Keps nut 3 (SGP-303037 and SGP-353037) usually ships 1-5 days
22 252-1654 Screw 10-32 x 3/4 1 (SGP-353037E and SGP-403537E) usually ships 1-5 days
24 999-0028 Washer 5/16 split lock plain finish 2 usually ships 11-14 days
25 999-0024 Washer 5/16 flat stainless steel 4 usually ships 11-14 days
26 252-1227 Screw 10-32 x 1 1/4 inch ground post                         1 usually ships 1-5 days
27 252-1659 Ground decal 1 usually ships 1-5 days
28 999-1275 Screw 10-32 x 3/4 hex head stainless steel 6 usually ships 11-14 days
29 252-0115 Capacitor cap 1 (SGP-353037 and SGP-302517) usually ships 14-20 days
30 252-1660 Thermostat mounting plate 1 usually ships 10-13 days
31 252-1661 Screw M4 x 6mm 4 usually ships 10-13 days
32 252-1662 Thermostat dial 1 usually ships 10-13 days

Downstream Injector Assembly

#PartDescription ReqNotesAvailability
1a 252-1357 Non-adjusting detergent injector 1 (SGP-303037, SGP-353037, SGP-353037E, SGP-403537E) usually ships 10-13 days
1b 252-1693 Non-adjusting detergent injector 1 (SGP-302517) usually ships 1-5 days
2 252-1109 Hose clamp 2 usually ships 14-20 days
3 252-1251 Clear vinyl hose 6 ft usually ships 14-20 days
4 252-0149 Strainer 1/4 inch hose barb                                  1 usually ships 14-20 days

Engine Assembly - Models 550.0, 551.0, 552.0 and 553.0

#PartDescription ReqNotesAvailability
2 252-1701 Hot warning decal 3 usually ships 1-5 days
9 252-0265 Elbow 1 usually ships 14-20 days
18 252-0270 Wheel assembly 4 usually ships 10-13 days
19 252-0015 Collar 5/8 inch                                              4 usually ships 1-5 days
20 999-0349 Washer 5/8 SAE flat 4 usually ships 11-14 days
22a 252-1736 Pump (KG3035G1) 1 (550.0 model) usually ships 1-5 days
22b 252-2007 Pump 3540G3 1 (551.0, 552.0 and 553.0 models) usually ships 1-5 days
23 252-1737 Hose 3/8 x 29 inch 1 usually ships 10-13 days
24 252-1546 Pump protector 1 usually ships 10-13 days
25 252-1112 Temperature limit switch 1 (non steam option only) usually ships 10-13 days
26 252-0264 Elbow 1 usually ships 14-20 days
27 252-1738 Unloader 1 usually ships 10-13 days
28 252-1602 1/2 inch brass elbow 1 usually ships 10-13 days
29 252-1260 Swivel 1/2 inch MP x 3/4 inch GHF w/strainer                 1 usually ships 10-13 days
30 252-1739 90 degree hosebarb 1 usually ships 10-13 days
31 252-1109 Hose clamp 6 usually ships 14-20 days
32 252-1727 Push on hose 14 in (steam option only) usually ships 14-20 days
33a 252-1740 Battery box 1 usually ships 10-13 days
33b 252-1741 Battery box plate 1 usually ships 1-5 days
34 252-1165 6 gallon burner diesel tank 1 usually ships 14-20 days
35 252-1544 Fuel cap 1 usually ships 1-5 days
39 252-1743 Bolt 1/4 x 1 carriage 4 usually ships 1-5 days
43 252-1768 Elbow 1 usually ships 10-13 days
45 252-0073 Axle 30 inch                                                 2 usually ships 1-5 days
46 252-1211 Cool engine danger label 1 usually ships 1-5 days
53a 999-0024 Washer 5/16 flat stainless steel 22 usually ships 11-14 days
53b 999-0450 Washer 7/16 internal star lock zinc plated 2 usually ships 9-12 days
54 273-0656 Screw 5/16 x 1 1/4 inch whiz loc flange 4 (552.0 and 553.0 models) usually ships 14-20 days
55 252-1747 Shut-off valve 1 usually ships 14-20 days
57a 252-1748 Valve cap with port 1 (550.0 model) usually ships 1-5 days
57b 252-1749 Valve cap with gauge port 1 (551.0, 552.0 and 553.0 models) usually ships 1-5 days
62 252-0079 Oil drain plug 1 usually ships 1-5 days
63 252-1751 Push on swivel 1 usually ships 1-5 days
64 252-1752 Plug 1 usually ships 1-5 days
65 252-1753 6 gauge wire (red) 33 in (552.0 and 553.0 models) usually ships 1-5 days
66 252-0081 6 gauge wire (black) (sold by the foot) 45 in (552.0 and 553.0 models) usually ships 1-5 days
67 252-0082 Universal battery post connector 2 (552.0 and 553.0 models) usually ships 1-5 days
68 252-1722 Nut 5/16 whiz loc flange 8 usually ships 1-5 days
70 252-1756 Square keyway 1 usually ships 1-5 days
72 252-0109 Nut 1/4 inch ESNA                                            4 usually ships 1-5 days
73 252-1757 Brake pad bracket (black) 1 usually ships 1-5 days
75 252-1167 Diesel caution label 1 usually ships 1-5 days
77 252-1759 Open for steam decal 1 (steam option only) usually ships 1-5 days
78 252-1934 Nipple 1 (steam option only) usually ships 14-20 days
79 999-0123 Washer 1/4 SAE flat zinc plated 12 usually ships 11-14 days
80 252-1220 Flow contol w/metering valve 1 (steam option only) usually ships 14-20 days
81 252-1761 1/4 inch tee 1 (steam option only) usually ships 1-5 days
83 252-1762 Brake linkage (black) 1 usually ships 1-5 days
89 252-1763 Bolt 3/8 x 1 3/4 4 usually ships 1-5 days
90 999-0034 Washer 3/8 split lock plain finish 4 usually ships 11-14 days
93 252-1727 Push on hose 14 in usually ships 14-20 days
94 252-1719 Screw 3/8 x 1 1/4 whiz loc 4 usually ships 1-5 days
95 252-1768 Elbow 1 (steam option only) usually ships 10-13 days
102 252-1765 Brake lever (black) 1 usually ships 1-5 days
106 252-1102 Rubber bushing 2 usually ships 14-20 days
108 252-1767 Long fuel tank strap 2 usually ships 1-5 days
109 225-0424 Flow switch 1 (steam option only) usually ships 10-13 days
111 252-1727 Push on hose 11 in usually ships 14-20 days
112 252-0264 Elbow 1 (steam option only) usually ships 14-20 days
113 252-1768 Elbow 2 (steam option only) usually ships 10-13 days
117 252-1769 Decal 1 usually ships 1-5 days
123 999-0120 Washer 3/8 SAE flat 4 usually ships 11-14 days
124a 999-1170 Bolt M10-1.5 x 20mm hex head stainless steel 2 (551.0, 552.0 and 553.0 models) usually ships 11-14 days
124b 999-0517 Bolt M8-1.25 x 16mm hex head full thread zinc 2 (550.0 model) usually ships 11-14 days
125 252-0096 Soft rubber pad 1 usually ships 1-5 days
126 252-1634 Bolt 1 1/4 x 3/8 1 usually ships 1-5 days
127 999-0120 Washer 3/8 SAE flat 1 usually ships 11-14 days
128 252-1771 Nut 1 usually ships 1-5 days
129a 252-1772 Pump support rail 1 (551.0, 552.0 and 553.0 models) usually ships 1-5 days
129b 252-0093 Small pump support rail 1 (550.0 model) usually ships 1-5 days
134 252-1774 Short fuel tank strap 2 usually ships 1-5 days
135 252-1176 Screw 3/8 inch x 3/4 inch HH NC                              2 usually ships 1-5 days
136 252-1177 Nut 3/8 inch Flange whiz lock                                2 usually ships 1-5 days
137 252-1775 Fuel tank strap 2 usually ships 10-13 days
139 252-1647 Screw 1/4 x 1/2 whiz loc 2 usually ships 1-5 days
140 162-0114 12V 50Ah AGM battery 1 usually ships 18-19 days
142 252-1777 Regulation decal 1 usually ships 1-5 days
N/S 252-2108 12V DC burner igniter 1 usually ships 10-13 days
N/S 252-2111 12V Powerlight ignitor 1 usually ships 14-20 days
N/S 252-2118 11 HP Honda engine, GX340UT2 QAH2 1 (550.0 model) usually ships 10-13 days
N/S 373-3050 Guide sliding connector 1 (UU1 Unloader) usually ships 14-20 days

Frame and Engine Assembly - Models 554.0 and 555.0

#PartDescription ReqNotesAvailability
1 252-1700 Tank head assembly 1 usually ships 10-13 days
2 252-1701 Hot warning decal 3 usually ships 1-5 days
3 252-1702 Retaining clip 4 usually ships 10-13 days
4 252-0008 Burner insulation retainer (OBSOLETE) 1 usually ships 10-13 days
5 252-1778 Coil assembly 1 usually ships 1-5 days
6 252-1779 Outer coil wrap 1 usually ships 1-5 days
10 252-1507 3/8 inch coupler with male threads 1 usually ships 10-13 days
11 225-0446 Safety relief valve 1 usually ships 10-13 days
13 252-1706 Conduit hose 3 ft usually ships 10-13 days
14 252-1154 Screw 1/4 inch x 34 inch hex head                            8 usually ships 14-20 days
15 252-1708 Bottom insulation 1 usually ships 10-13 days
16 252-1780 Frame assembly 1 usually ships 1-5 days
17 252-1710 Decal 2 usually ships 1-5 days
18 252-0270 Wheel assembly 4 usually ships 10-13 days
19 252-0015 Collar 5/8 inch                                              4 usually ships 1-5 days
20 999-0349 Washer 5/8 SAE flat 4 usually ships 11-14 days
22a 252-1781 Pump (KG2530G) 1 (554.0 model) usually ships 1-5 days
22b 252-1782 Pump (KG3030G) 1 (555.0 model) usually ships 1-5 days
23 252-1737 Hose 3/8 x 29 inch 1 usually ships 10-13 days
24 252-1546 Pump protector 1 usually ships 10-13 days
25 252-1112 Temperature limit switch 1 (non steam option) usually ships 10-13 days
26 252-0264 Elbow 1 usually ships 14-20 days
27 252-1738 Unloader 1 usually ships 10-13 days
28 252-1602 1/2 inch brass elbow 1 usually ships 10-13 days
29 252-1260 Swivel 1/2 inch MP x 3/4 inch GHF w/strainer                 1 usually ships 10-13 days
31 252-1109 Hose clamp 4 usually ships 14-20 days
34 252-1165 6 gallon burner diesel tank 1 usually ships 14-20 days
35 252-1544 Fuel cap 1 usually ships 1-5 days
36 252-1783 Screw 5/16 x 2 3/4 whiz loc 2 usually ships 1-5 days
37 252-1784 Vibration mount 4 usually ships 10-13 days
38 273-9436 Grommet 4 usually ships 14-20 days
42 252-1177 Nut 3/8 inch Flange whiz lock                                4 usually ships 1-5 days
44 252-1712 Hosebarb 1 usually ships 1-5 days
45 252-1785 Axle 2 usually ships 1-5 days
46 252-1211 Cool engine danger label 1 usually ships 1-5 days
47 252-1786 90 degree elbow 1 usually ships 1-5 days
49 252-0076 Nut 3/8 inch x 12 gauge, cage                                4 usually ships 10-13 days
50a 225-0448 Voltage regulator 1 (pull start) usually ships 14-20 days
50b 225-0449 Rectifier assembly 1 (electric start) usually ships 10-13 days
51 252-1715 Bolt 5/16 x 3/4 inch 14 usually ships 1-5 days
52 273-9720 Nut 5/16 10 usually ships 14-20 days
53 999-0024 Washer 5/16 flat stainless steel 28 usually ships 11-14 days
55 252-1747 Shut-off valve 1 usually ships 14-20 days
57 252-1748 Valve cap with port 1 usually ships 1-5 days
58 252-1718 Tank head insulation 1 usually ships 10-13 days
59 252-1719 Screw 3/8 x 1 1/4 whiz loc 4 usually ships 1-5 days
60 252-0036 Nut 1/4 inch x 16 gauge cage                                 4 usually ships 10-13 days
61 252-1721 Hot water outlet decal 1 usually ships 1-5 days
63 252-1751 Push on swivel 1 usually ships 1-5 days
64 252-1752 Plug 1 usually ships 1-5 days
68 252-1722 Nut 5/16 whiz loc flange 8 usually ships 1-5 days
70 252-1787 Square keyway 1 usually ships 1-5 days
74 252-1724 Warning decal 1 usually ships 1-5 days
75 252-1167 Diesel caution label 1 usually ships 1-5 days
82 252-1726 Nipple 1/4 x 2 inch 1 usually ships 1-5 days
84 225-0450 Fuel filter 1 usually ships 10-13 days
85 252-1727 Push on hose 9 in usually ships 14-20 days
86 252-1727 Push on hose 11 in usually ships 14-20 days
87 252-1728 12/3 internal service cord 32 in usually ships 1-5 days
88 252-1181 Strain relief, 1/2 inch                                      1 usually ships 1-5 days
89 252-1788 Bolt 5/16 x 1 1/2 2 usually ships 1-5 days
90 999-0028 Washer 5/16 split lock plain finish 2 usually ships 11-14 days
94 252-1789 Bolt 5/16 x 24 3/4 4 usually ships 1-5 days
96 252-0047 Reducer M14 x 1/4 inch                                       1 usually ships 1-5 days
97 252-1712 Hosebarb 1 usually ships 1-5 days
98 252-1768 Elbow 1 usually ships 10-13 days
99 252-1731 Street elbow 1 usually ships 1-5 days
100 252-1791 Snap bushing 1 usually ships 1-5 days
101 252-1792 Blanket insulation 1 usually ships 10-13 days
105 252-1732 Double hosebarb 1 usually ships 10-13 days
106 252-1102 Rubber bushing 2 usually ships 14-20 days
107 999-0028 Washer 5/16 split lock plain finish 4 usually ships 11-14 days
108 252-1767 Long fuel tank strap 2 usually ships 1-5 days
111 252-1727 Push on hose 7 in usually ships 14-20 days
114 252-1733 Square head plug 1 usually ships 1-5 days
115 999-0448 Screw 10-24 x 1/4 cup point socket set alloy plain finish 1 usually ships 11-14 days
116 252-1608 45 degree elbow 1 usually ships 1-5 days
117 252-1769 Decal 1 usually ships 1-5 days
118 252-1793 Nipple 1 usually ships 10-13 days
119 252-1794 Fender washer 2 usually ships 1-5 days
120 252-0057 Tip over hazard decal 1 usually ships 1-5 days
121 252-0094 Cleaning solution decal 1 usually ships 1-5 days
132 252-1774 Short fuel tank strap 2 usually ships 1-5 days
133 252-1176 Screw 3/8 inch x 3/4 inch HH NC                              2 usually ships 1-5 days
134 252-1774 Short fuel tank strap 2 usually ships 1-5 days
135 252-1176 Screw 3/8 inch x 3/4 inch HH NC                              2 usually ships 1-5 days
136 252-1177 Nut 3/8 inch Flange whiz lock                                2 usually ships 1-5 days
141 252-1795 Nozzle decal 1 usually ships 1-5 days
142 252-1777 Regulation decal 1 usually ships 1-5 days
144 999-1213 Washer 5/16 x 1 1/2 fender stainless steel 4 usually ships 11-14 days
145 252-1735 Shark decal 2 usually ships 1-5 days
N/S 252-1964 Solenoid valve 1 usually ships 1-5 days
N/S 252-0279 Fuel pump usually ships 10-13 days

Frame Assembly - Models 550.0, 551.0, 552.0 and 553.0

#PartDescription ReqNotesAvailability
1 252-1700 Tank head assembly 1 usually ships 10-13 days
2 252-1701 Hot warning decal 3 usually ships 1-5 days
3 252-1702 Retaining clip 4 usually ships 10-13 days
4 252-0008 Burner insulation retainer (OBSOLETE) 1 usually ships 10-13 days
5 252-0269 Coil 1 usually ships 10-13 days
6 252-1704 Outer coil wrap 1 usually ships 10-13 days
8 252-1705 Discharge manifold 1 usually ships 10-13 days
10 252-1507 3/8 inch coupler with male threads 1 usually ships 10-13 days
11 225-0446 Safety relief valve 1 usually ships 10-13 days
13 252-1706 Conduit hose 3 ft usually ships 10-13 days
14 252-1154 Screw 1/4 inch x 34 inch hex head                            4 usually ships 14-20 days
15 252-1708 Bottom insulation 1 usually ships 10-13 days
16 252-1709 Frame assembly 1 usually ships 1-5 days
17 252-1710 Decal 2 usually ships 1-5 days
18 252-0270 Wheel assembly 4 usually ships 10-13 days
19 252-0015 Collar 5/8 inch                                              4 usually ships 1-5 days
20 999-0349 Washer 5/8 SAE flat 4 usually ships 11-14 days
31 252-1109 Hose clamp 6 usually ships 14-20 days
37 252-1711 Vibration mount 4 usually ships 14-20 days
38 273-9436 Grommet 4 usually ships 14-20 days
41 999-1012 Nut 5/16-18 wing stainless steel 4 (552.0 and 553.0 models) usually ships 11-14 days
42 252-1177 Nut 3/8 inch Flange whiz lock                                4 usually ships 1-5 days
44 252-1712 Hosebarb 1 usually ships 1-5 days
47 252-1713 90 degree elbow 1 usually ships 1-5 days
49 252-0076 Nut 3/8 inch x 12 gauge, cage                                4 usually ships 10-13 days
50a 225-0448 Voltage regulator 1 (pull start) usually ships 14-20 days
50b 225-0449 Rectifier assembly 1 (electric start) usually ships 10-13 days
51 252-1715 Bolt 5/16 x 3/4 inch 14 usually ships 1-5 days
52 273-9720 Nut 5/16 8 usually ships 14-20 days
53 999-0024 Washer 5/16 flat stainless steel 22 usually ships 11-14 days
56 252-1717 Nozzle identification decal 1 usually ships 1-5 days
58 252-1718 Tank head insulation 1 usually ships 10-13 days
59 252-1719 Screw 3/8 x 1 1/4 whiz loc 4 usually ships 1-5 days
60 252-0036 Nut 1/4 inch x 16 gauge cage                                 5 usually ships 10-13 days
61 252-1721 Hot water outlet decal 1 usually ships 1-5 days
68 252-1722 Nut 5/16 whiz loc flange 8 usually ships 1-5 days
71 252-1723 Insulation retaining ring 1 usually ships 10-13 days
74 252-1724 Warning decal 1 usually ships 1-5 days
76 252-0083 Bushing 7/8 inch snap                                        1 usually ships 1-5 days
82 252-1726 Nipple 1/4 x 2 inch 1 usually ships 1-5 days
84 225-0450 Fuel filter 1 usually ships 10-13 days
85 252-1727 Push on hose 9 in usually ships 14-20 days
86 252-1727 Push on hose 7 in usually ships 14-20 days
87 252-1728 12/3 internal service cord 40 in usually ships 1-5 days
88 252-1181 Strain relief, 1/2 inch                                      1 usually ships 1-5 days
91 999-0028 Washer 5/16 split lock plain finish 4 (552.0 and 553.0 models) usually ships 11-14 days
92 252-1729 Nipple 1 usually ships 1-5 days
98 252-1768 Elbow 1 usually ships 10-13 days
99 252-1731 Street elbow 1 usually ships 1-5 days
103a 252-1654 Screw 10-32 x 3/4 3 (550.0 and 551.0 models) usually ships 1-5 days
103b 252-1227 Screw 10-32 x 1 1/4 inch ground post                         2 (552.0 and 553.0 models) usually ships 1-5 days
104a 252-1222 Nut 10/32 keps 2 (552.0 and 553.0 models) usually ships 1-5 days
104b 252-1222 Nut 10/32 keps 3 (550.0 and 551.0 models) usually ships 1-5 days
105 252-1732 Double hosebarb 1 usually ships 10-13 days
114 252-1733 Square head plug 1 usually ships 1-5 days
115 999-0448 Screw 10-24 x 1/4 cup point socket set alloy plain finish 1 usually ships 11-14 days
116 252-1608 45 degree elbow 1 usually ships 1-5 days
120 252-0057 Tip over hazard decal 1 usually ships 1-5 days
121 252-0094 Cleaning solution decal 1 usually ships 1-5 days
130 252-1734 Countersunk plug 1 usually ships 10-13 days
133 252-1176 Screw 3/8 inch x 3/4 inch HH NC                              2 usually ships 1-5 days
138 252-1140 Nut 1/4 flange zinc 2 usually ships 1-5 days
143 999-1012 Nut 5/16-18 wing stainless steel 4 usually ships 11-14 days
145 252-1735 Shark decal 2 usually ships 1-5 days

Hose and Spray Gun Assembly

#PartDescription ReqNotesAvailability
1a 991-8188 3/8 inch female quick connect 1 usually ships 13-17 days
1b 252-1674 O-ring 1 usually ships 10-13 days
2a 252-1675 50 foot wire reinforced flex hose 1 (all models except SGP-403537E) usually ships 14-20 days
2b 252-1356 50 foot wire reinforced flex hose 1 (SGP-403537E) usually ships 14-20 days
2c 252-2053 100 foot wire reinforced flex hose 1 (SGP-403537E) usually ships 1-5 days
3 252-1676 Spray gun 1 usually ships 10-13 days
4a 991-8186 Dual lance wand 1 usually ships 10-13 days
4b 252-1677 Wand repair kit 1 (internal components) usually ships 1-5 days
5 252-0130 Brass nozzle 1/8 inch                                        1 usually ships 1-5 days
6a 252-0131 Coupler 1/4 inch male                                        1 usually ships 1-5 days
6b 252-1680 O-ring 1 usually ships 14-20 days
7a 213-0245 Chemical injector 1 (all models except SGP-302517) usually ships 14-20 days
7b 252-1682 Detergent injector assembly 1 (SGP-302517) usually ships 1-5 days
8a 252-1683 Nozzle (yellow) (1503.5) 1 (SGP-302517 and SGP-403537E) usually ships 10-13 days
8b 252-1684 Nozzle (green) (2503.5) 1 (SGP-302517 and SGP-403537E) usually ships 10-13 days
8c 252-1685 Nozzle (white) (4003.5) 1 (SGP-302517 and SGP-403537E) usually ships 14-20 days
8d 252-1686 Nozzle (red) (0003.5) 1 (SGP-302517 and SGP-403537E) usually ships 14-20 days
8e 991-8195 15 degree nozzle (yellow) (1504.5) 1 (SGP-353037 and SGP-353037E) usually ships 10-13 days
8f 991-8196 25 degree nozzle (green) (2504.5) 1 (SGP-353037 and SGP-353037E) usually ships 1-5 days
8g 991-8197 40 degree nozzle (white) (4004.5) 1 (SGP-353037 and SGP-353037E) usually ships 1-5 days
8h 991-8194 0 degree nozzle (red) (0004.5) 1 (SGP-353037 and SGP-353037E) usually ships 1-5 days
8i 252-0140 Nozzle (yellow) (1503) 1 (SGP-303037) usually ships 10-13 days
8j 252-0141 Nozzle (green) (2503) 1 (SGP-303037) usually ships 10-13 days
8k 252-1691 Nozzle (white) (4003) 1 (SGP-303037) usually ships 1-5 days
8l 252-0143 Red nozzle 1 (SGP-303037) usually ships 10-13 days
N/S 252-1214 Nozzle kit 1 usually ships 10-13 days

Hose Reel Assembly - Optional

#PartDescription ReqNotesAvailability
1 991-8188 3/8 inch female quick connect 1 usually ships 13-17 days
2 252-1697 Pressure hose 1 usually ships 1-5 days
3 252-1698 100 foot hose reel with locking pin (OBSOLETE) 1 usually ships 1-5 days
4 252-1176 Screw 3/8 inch x 3/4 inch HH NC                              4 usually ships 1-5 days
5 252-1177 Nut 3/8 inch Flange whiz lock                                4 usually ships 1-5 days
6 252-0146 Bracket 1 usually ships 10-13 days