- Commonly Asked For Parts

#PartDescription ReqNotesAvailability
01 272-7398 Caster wheel 2 usually ships 13-16 days
02 272-7541 12V vacuum motor usually ships 13-16 days
03 272-7396 Squeegee blade kit usually ships 13-16 days
04 272-7516 Cover assembly usually ships 13-16 days
05 572-3287 SQUEEGEE KIT 1 usually ships 13-16 days
06 272-7396 Squeegee blade kit 1 usually ships 13-16 days

- Pad Holders

#PartDescription ReqNotesAvailability
1 991-2214 Center-Lok II pad holder - left hand thread (red) usually ships 14-24 days
2a 991-2201 Center-Lok II pad holder - right hand thread (black) (Pad driver side female, Floor side male) usually ships 13-17 days
2b 991-8577 Pad retainer (Pad driver side male, Floor side female) usually ships 13-17 days
3a 991-2202 Big mouth pad holder set (blue) (includes 3 screws) usually ships 14-24 days
3b 991-2205 Deep lock ring and pad grip ring usually ships 17-22 days
4 991-2203 Big mouth pad holder male thread portion usually ships 17-22 days
5 991-2206 Center-Lok 3 pad holder (includes 3 screws) usually ships 13-17 days
6 996-0372 Big mouth pad holder (left hand thread) usually ships 14-24 days
7 N/A Not available usually ships 3-26 days
8 991-2209 Split retainer - pad holder ring (OBSOLETE) usually ships 13-17 days
9 N/A Not available (replaced by #3 991-2202) usually ships 3-26 days
10 991-2211 Center lock pad holding cup (male) (yellow) (OBSOLETE) usually ships 17-22 days

- Pads

#PartDescription ReqNotesAvailability
01 255-1440 14 inch aqua plus burnishing pad (pkg of 5) usually ships 32-33 days
02 255-1435 14 inch Armadillo concrete scrubbing pad (pkg of 5) usually ships 32-33 days
03 255-1464 14 inch Blue ace pad (pkg of 5) usually ships 32-33 days
04 255-1442 14 inch Blue Jay burnishing pad (pkg of 5) usually ships 32-33 days
05 255-1412 14 inch Cure white pad (pkg of 5) usually ships 32-33 days
06 255-1477 14 inch Diamondback extreme stripping pad (pkg of 5) usually ships 32-33 days
07 255-1438 14 inch EHD Extra Heavy Duty Concrete Leveling Pad (pkg of 2 usually ships 32-33 days
08 255-1421 14 inch gorilla lite burnishing pad (pkg of 5) usually ships 32-33 days
09 255-1450 14 inch gorilla spray buff/polish/burnish pad (pkg of 5) usually ships 32-33 days
10 255-1465 14 inch Heat concrete bonding pad (pkg of 5) usually ships 32-33 days
11 255-1430 14 inch jaguar burnishing pad (pkg of 5) usually ships 32-33 days
12 255-1487 14 inch Melamine Mela-Kleen pad (pkg of 2)         usually ships 32-33 days
13 255-1490 14 inch premium black stripping pad (pkg of 5) usually ships 32-33 days
14 255-1470 14 inch premium blue cleaning pad (pkg of 5) usually ships 32-33 days
15 255-1492 14 inch premium brown stripping pad (pkg of 5) usually ships 32-33 days
16 255-1480 14 inch premium green scrubbing pad (pkg of 5) usually ships 32-33 days
17 255-1460 14 inch premium red scrubbing pad (pkg of 5) usually ships 32-33 days
18 255-1452 14 inch premium tan polishing pad (pkg of 5) usually ships 32-33 days
19 255-1420 14 inch premium white polishing pad (pkg of 5) usually ships 32-33 days
20 255-1411 14 inch superspeed rubberized pad (pkg of 5) usually ships 32-33 days
21 255-1495 14 inch razorback stripping pad (pkg of 5) usually ships 32-33 days
22 255-1447 14 inch Redwood maroon floor prep pad (pkg of 10) usually ships 32-33 days
23 255-1455 14 inch Ruff non-abrasive brush pad (pkg of 2) usually ships 32-33 days
24 255-1423 14 inch sand screen driver pad (pkg of 2) usually ships 32-33 days
25 255-0120 14 inch Professional sand screen 100 grit (pkg of 10) usually ships 32-33 days
26 255-0121 14 inch Professional sand screen 120 grit (pkg of 10) usually ships 32-33 days
27 255-0122 14 inch Professional sand screen 180 grit (pkg of 10) usually ships 32-33 days
28 255-0119 14 inch Professional sand screen 60 grit (pkg of 10) usually ships 32-33 days
29 255-0205 14 inch Superscreen sand screen 100 grit (pkg of 10) usually ships 32-33 days
30 255-0206 14 inch Superscreen sand screen 120 grit (pkg of 10) usually ships 32-33 days
31 255-0207 14 inch Superscreen sand screen 180 grit (pkg of 10) usually ships 32-33 days
32 255-0204 14 inch Superscreen sand screen 60 grit (pkg of 10) usually ships 32-33 days
33 255-1424 14 x 20 inch Tiger carpet bonnet (pkg of 2) usually ships 32-33 days
34 255-9549 14 inch Diamond by Gorilla 11000 Grit (pkg of 2) usually ships 32-33 days
35 255-9546 14 inch Diamond by Gorilla 1500 Grit (pkg of 2) usually ships 32-33 days
36 255-9543 14 inch Diamond by Gorilla 200 Grit (pkg of 2) usually ships 32-33 days
37 255-9547 14 inch Diamond by Gorilla 3000 Grit (pkg of 2) usually ships 32-33 days
38 255-9544 14 inch Diamond by Gorilla 400 Grit (pkg of 2) usually ships 32-33 days
39 255-9545 14 inch Diamond by Gorilla 800 Grit (pkg of 2) usually ships 32-33 days
40 255-9548 14 inch Diamond by Gorilla 8000 Grit (pkg of 2) usually ships 32-33 days
41 255-9639 14 inch Diamond starter pack (1 of each grit) usually ships 32-33 days
42 255-1482 14 inch Turbostrip segmented rotary pad (pkg of 4) usually ships 32-33 days
43 255-1415 14 inch Duala clean and shine pad - low speed (pkg of 5) usually ships 32-33 days
44 255-1416 14 inch 2001 Duala clean shine padhighspeed (pkg 5)(OBSOLETE usually ships 32-33 days

Brush Deck Assembly

#PartDescription ReqNotesAvailability
1 999-0497 Nut M6-1 nylon insert lock stainless steel 4 (nut) usually ships 11-14 days
2 999-0953 Nut M5-.8 hex nylon insert lock stainless steel 2 usually ships 11-14 days
3 272-1931 Knob 2 usually ships 13-16 days
4 272-7135 Buffer 4 usually ships 13-16 days
5 272-8031 Plug 2 usually ships 13-16 days
6 572-3285 HARDWARE DECK KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
7 572-3285 HARDWARE DECK KIT (OBSOLETE) 4 (washer) usually ships 13-16 days
8 272-1939 Vibration damping plate 2 usually ships 13-16 days
9 999-0496 Nut M8-1.25 nylon insert lock stainless steel 1 usually ships 11-14 days
10 999-1409 Screw M8-1.25 x 12mm socket head stainless steel 4 usually ships 1-5 days
11 572-3285 HARDWARE DECK KIT (OBSOLETE) 1 (washer) usually ships 13-16 days
12 572-3285 HARDWARE DECK KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
13 272-1919 Vibration damping M8 (set of 2) 1 usually ships 13-16 days
14 572-3209 SUPPORT BRUSH DECK (OBSOLETE) 1 usually ships 13-16 days
15 272-7574 Brush plate fixing pin 2 usually ships 13-16 days
16 999-1409 Screw M8-1.25 x 12mm socket head stainless steel 1 usually ships 1-5 days
17 272-1978 Rubber barb 1 usually ships 13-16 days
18 999-1300 Screw M6-1 x 25mm socket head stainless steel 8 usually ships 1-5 days
19 572-3285 HARDWARE DECK KIT (OBSOLETE) 4 (washer) usually ships 13-16 days
20 572-3204 REDUCTION GEARMOTOR KIT 12V (OBSOLETE) 1 usually ships 13-16 days
21 172-3730 Square keyway 1 usually ships 13-16 days
22 572-9298 Polygonal flange 1 usually ships 13-16 days
23 172-0469 Brush hub 1 usually ships 13-16 days
24 999-1648 Screw M8-1.25 x 20mm socket head stainless steel 1 usually ships 11-14 days
25 999-6678 Washer M6 nord lock 3 usually ships 11-14 days
26 572-3285 HARDWARE DECK KIT (OBSOLETE) 4 (washer) usually ships 13-16 days
27 572-3285 HARDWARE DECK KIT (OBSOLETE) 1 (screw) usually ships 13-16 days
28 999-1320 Screw M6-1 x 20mm socket head stainless steel 3 usually ships 11-14 days
29 572-3229 FLANGE (OBSOLETE) 1 usually ships 13-16 days
30 272-6783 Cable tie (black) (pkg of 10) 3 (spring) usually ships 13-16 days
31 272-6783 Cable tie (black) (pkg of 10) 1 (spring) usually ships 13-16 days
32 572-3258 SQUEEGEE HOSE 1 usually ships 13-16 days
33 572-3285 HARDWARE DECK KIT (OBSOLETE) 2 (clamp) usually ships 13-16 days
34 272-6790 14 inch pad driver usually ships 13-16 days
35 272-6783 Cable tie (black) (pkg of 10) (includes 30 and 31) usually ships 13-16 days
N/S 572-3285 HARDWARE DECK KIT (OBSOLETE) (includes 1, 2, 6,7, 9-12, 16, 18, 19, 24-28 and 33) usually ships 13-16 days

Brush Deck Skirt Assembly

#PartDescription ReqNotesAvailability
1 572-3248 BRUSH LINEAR 1 usually ships 13-16 days
2 172-0700 Bumper roller 1 usually ships 13-16 days
3 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (screw) usually ships 13-16 days
4 572-3892 WHEEL 2 usually ships 13-16 days
5 572-3286 COUPLING DECK KIT 13 (nut) usually ships 13-16 days
6 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (nut) usually ships 13-16 days
7 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (washer) usually ships 13-16 days
8 572-3286 COUPLING DECK KIT 3 (washer) usually ships 13-16 days
9 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (pin) usually ships 13-16 days
10 572-3286 COUPLING DECK KIT 3 (nut) usually ships 13-16 days
11 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
12 999-1257 Screw M6-1 x 16mm pan head Phillips 13 usually ships 11-14 days
13 999-1120 Nut M10-1.5 nylon insert lock stainless steel 3 usually ships 11-14 days
14 272-7398 Caster wheel 3 usually ships 13-16 days
15 572-3287 SQUEEGEE KIT 1 (18 in (455 mm) squeegee weldment) usually ships 13-16 days
16 572-3287 SQUEEGEE KIT 1 ( 18 inch rear squeegee strap) usually ships 13-16 days
17 572-3230 COVER BRUSH DECK 1 usually ships 13-16 days
18 572-3286 COUPLING DECK KIT 2 (flange) usually ships 13-16 days
19 572-3231 COUPLING RUBBER DECK 1 usually ships 13-16 days
20 572-3286 COUPLING DECK KIT 1 (flange) usually ships 13-16 days
21 272-7525 Cover pin 2 usually ships 13-16 days
22 572-3249 COUNTERWEIGHT 1 usually ships 13-16 days
23 572-3287 SQUEEGEE KIT 1 usually ships 13-16 days
24 572-3287 SQUEEGEE KIT 1 (18 in (455 mm) rear squeegee strap) usually ships 13-16 days
25 999-0740 Nut M5-.8 hex stainless steel 2 usually ships 11-14 days
26 572-3286 COUPLING DECK KIT 3 usually ships 13-16 days
27 572-3262 PLATE BUMPER FIX 2 usually ships 13-16 days
28 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (screw) usually ships 13-16 days
29 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
30 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) 1 (screw) usually ships 13-16 days
KIT 1 572-3286 COUPLING DECK KIT (includes 4, 8,10, 12, 18-20 and 26) usually ships 13-16 days
KIT 2 572-3287 SQUEEGEE KIT (Includes 15,16, 23 and 24) usually ships 13-16 days
N/S 572-3288 HARDWARE COVER DECK KIT (OBSOLETE) (includes 3,6,7,9,11,13,25 and 28-30) usually ships 13-16 days

Cover and Tanks Assembly

#PartDescription ReqNotesAvailability
1 272-7516 Cover assembly 1 (cover tank) usually ships 13-16 days
2 272-7516 Cover assembly 1 (cage float) usually ships 13-16 days
3a 272-7516 Cover assembly 6 (screw) usually ships 13-16 days
3b 272-7517 Cover and tank hardware assembly usually ships 1-5 days
4 272-7516 Cover assembly 1 (ball floating) usually ships 13-16 days
5 272-7516 Cover assembly 1 (cap tank) usually ships 13-16 days
6 272-7518 Cover tank gasket 1 usually ships 13-16 days
7 272-7516 Cover assembly 1 (gasket) (gasket) usually ships 13-16 days
8 272-7519 Battery cover 1 usually ships 1-5 days
9 272-5889 Washer 1 usually ships 13-16 days
10 472-1253 PLUNGER M10 D.6 W/NUT PKD 1 usually ships 13-16 days
11 272-7517 Cover and tank hardware assembly 10 (screw) usually ships 1-5 days
12 272-7517 Cover and tank hardware assembly 6 (washer) usually ships 1-5 days
13 272-7517 Cover and tank hardware assembly 2 (bush) usually ships 1-5 days
14 272-7520 Plate 1 usually ships 1-5 days
15 272-7521 Solution tank 1 usually ships 13-16 days
16 572-3276 HANDLE DETERGENT TANK 1 usually ships 13-16 days
17 272-7523 Threaded cap 1 usually ships 13-16 days
18 272-7524 Handle tank plate 2 usually ships 1-5 days
19 272-7525 Cover pin 2 usually ships 13-16 days
20 272-7517 Cover and tank hardware assembly 4 (washer) usually ships 1-5 days
21 272-7517 Cover and tank hardware assembly 4 (screw) usually ships 1-5 days
22 272-7526 Recovery tank 1 usually ships 13-16 days
23 272-7527 Recovery tank handle 1 usually ships 1-5 days
24 272-7528 Fill hose assembly 1 usually ships 13-16 days
25 572-3304 LABELS KIT SC350 ADVANCE 1 usually ships 13-16 days
26 162-0042 12V 115Ah AGM battery (Group 31) (SNSR) 1 usually ships 25-34 days
27 572-3281 PANEL BATTERY 30X170X110MM 1 usually ships 13-16 days
KIT 1 272-7516 Cover assembly usually ships 13-16 days
KIT 2 272-7517 Cover and tank hardware assembly usually ships 1-5 days

Frame Assembly

#PartDescription ReqNotesAvailability
1 272-7529 Pipe kit 1 (reduction water) usually ships 13-16 days
2 999-0740 Nut M5-.8 hex stainless steel 1 usually ships 11-14 days
3 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (screw) usually ships 13-16 days
4 572-3283 HARDWARE FRAME KIT (OBSOLETE) 7 (nut) usually ships 13-16 days
5 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (nut) usually ships 13-16 days
6 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
7 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (screw) usually ships 13-16 days
8 572-3283 HARDWARE FRAME KIT (OBSOLETE) 3 (washer) usually ships 13-16 days
9 572-3283 HARDWARE FRAME KIT (OBSOLETE) 4 (screw) usually ships 13-16 days
10 272-7529 Pipe kit 1 (fitting) usually ships 13-16 days
11 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
12 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (screw) usually ships 13-16 days
13 572-3217 WHEEL D.200MM (OBSOLETE) 2 usually ships 13-16 days
14 572-3354 CHASSIS KIT 1 usually ships 13-16 days
15a 572-3824 CHARGER BATT O/B 12V 12A 100-2 1 usually ships 13-16 days
15b 272-9290 Onboard charger cord 1 usually ships 13-16 days
16 272-7532 Gasket 1 usually ships 13-16 days
17 272-8552 Battery strap 1 usually ships 1-5 days
18 572-3283 HARDWARE FRAME KIT (OBSOLETE) 1 (clamp) usually ships 13-16 days
19 572-3292 DECK CABLE 1 usually ships 13-16 days
20 272-7534 Water valve assembly 1 usually ships 13-16 days
21 572-3283 HARDWARE FRAME KIT (OBSOLETE) 1 (screw) usually ships 13-16 days
22 272-7529 Pipe kit 1 (hose) usually ships 13-16 days
23 572-3283 HARDWARE FRAME KIT (OBSOLETE) 4 (ring) usually ships 13-16 days
24 572-3283 HARDWARE FRAME KIT (OBSOLETE) 2 (washer) usually ships 13-16 days
25 572-3218 PIN WHEEL (OBSOLETE) 1 usually ships 13-16 days
26 572-3283 HARDWARE FRAME KIT (OBSOLETE) 1 (hose) usually ships 13-16 days
27 272-7529 Pipe kit 1 (pipe) usually ships 13-16 days
28 572-3283 HARDWARE FRAME KIT (OBSOLETE) 1 (clamp) usually ships 13-16 days
29 572-3283 HARDWARE FRAME KIT (OBSOLETE) 4 (washer) usually ships 13-16 days
KIT1 272-7529 Pipe kit (includes 1,10,18,22,26 and 27) usually ships 13-16 days

Handle Bar Assembly

#PartDescription ReqNotesAvailability
1 272-8651 Handle support kit 3 (washer) usually ships 1-5 days
2 272-7561 Pump switch (OBSOLETE) 1 usually ships 13-16 days
3 272-8642 Protection cap 1 usually ships 1-5 days
4 272-7559 Handle bar harware assembly 2 (washer) usually ships 1-5 days
5 272-7559 Handle bar harware assembly 2 (screw) usually ships 1-5 days
6 272-7559 Handle bar harware assembly 1 (clamp) usually ships 1-5 days
7 272-7559 Handle bar harware assembly 2 (washer) usually ships 1-5 days
8 272-7559 Handle bar harware assembly 2 (clamp) usually ships 1-5 days
9 272-7559 Handle bar harware assembly 2 (screw) usually ships 1-5 days
10 272-7559 Handle bar harware assembly 2 (insert) usually ships 1-5 days
11 272-7562 LED Board 1 usually ships 13-16 days
12 272-7559 Handle bar harware assembly 2 (screw) usually ships 1-5 days
13 272-0659 On-board charger cord wrap 1 usually ships 13-16 days
14 272-8643 Knob control 1 usually ships 13-16 days
15 272-7559 Handle bar harware assembly 1 (screw) usually ships 1-5 days
16 272-7559 Handle bar harware assembly 2 (screw) usually ships 1-5 days
17 272-7559 Handle bar harware assembly 1 (seal) usually ships 1-5 days
18 572-3227 HARNESS HANDLE BAR 1 usually ships 13-16 days
19 572-3232 SWITCH ROTATIVE 4 POSITION SW1 (OBSOLETE) 1 usually ships 13-16 days
20 272-7564 Handle cover assembly 1 usually ships 1-5 days
21 572-3259 DECAL CONTROL PANEL 1 usually ships 13-16 days
22 272-8645 Battery decal 1 usually ships 1-5 days
23 272-8635 Cap 1 usually ships 1-5 days
24 272-8636 Cap (black) 1 usually ships 1-5 days
25 272-7566 Handle tube 1 usually ships 13-16 days
26 272-7567 Index rod 1 usually ships 1-5 days
27 272-8652 Handle switch lever kit 2 (lever switch) usually ships 13-16 days
28 272-8652 Handle switch lever kit 1 (lever) usually ships 13-16 days
29 272-8649 Lower cover kit 1 (cap) usually ships 1-5 days
30 272-8649 Lower cover kit 1 (rear cover) usually ships 1-5 days
31 272-8649 Lower cover kit 1 (front cover) usually ships 1-5 days
32 272-8652 Handle switch lever kit 1 (interlock button) usually ships 13-16 days
33 272-7568 Retainer 1 usually ships 1-5 days
34 272-7564 Handle cover assembly 1 usually ships 1-5 days
35 272-8640 Switch 1 usually ships 13-16 days
36 272-8652 Handle switch lever kit 1 (interlock spring) usually ships 13-16 days
37 272-7558 Lower housing assembly 1 (compression spring) usually ships 1-5 days
38 272-7558 Lower housing assembly 1 (gear) usually ships 1-5 days
39 272-7558 Lower housing assembly 1 (gear housing) usually ships 1-5 days
40 272-8652 Handle switch lever kit 1 (cord clamp) usually ships 13-16 days
41 272-8652 Handle switch lever kit 4 (pin) usually ships 13-16 days
42 272-7558 Lower housing assembly 1 (index gear) usually ships 1-5 days
43 272-8651 Handle support kit 1 (supprt handle) usually ships 1-5 days
44 272-7558 Lower housing assembly 2 (plate) usually ships 1-5 days
45 272-8652 Handle switch lever kit 2 (screw) usually ships 13-16 days
46 272-8649 Lower cover kit 4 (screw) usually ships 1-5 days
47 272-8651 Handle support kit 1 (screw) usually ships 1-5 days
48 999-0953 Nut M5-.8 hex nylon insert lock stainless steel 1 usually ships 11-14 days
49 999-0955 Nut M4-.7 hex nylon lock 1 usually ships 11-14 days
50 999-1308 Nut M6-1 hex stainless steel 4 usually ships 11-14 days
51 272-8651 Handle support kit 1 (screw) usually ships 1-5 days
54 272-8641 Handle plug 1 usually ships 1-5 days
55 999-1517 Screw M5-.8 x 12mm truss head stainless steel 6 usually ships 11-14 days
56 272-7558 Lower housing assembly 4 (screw) usually ships 1-5 days
58 999-9101 Screw M4-.7 x 10mm pan head stainless steel 3 usually ships 11-14 days
59 272-7559 Handle bar harware assembly 2 (screw) usually ships 1-5 days
KIT 1 272-8649 Lower cover kit (Includes 29-31 and 46) usually ships 1-5 days
KIT 2 272-7558 Lower housing assembly (includes 37-39,42.44,50 and 56) usually ships 1-5 days
KIT 3 272-8651 Handle support kit (includes 1,43,47,48,51 and 55) usually ships 1-5 days
KIT 4 272-8652 Handle switch lever kit (includes 27,28,36,40,41,45 and 58) usually ships 13-16 days
KIT 5 272-7559 Handle bar harware assembly (includes 4-10, 12,15-17 and 59) 7 and 59) usually ships 1-5 days

Handle Support Assembly

#PartDescription ReqNotesAvailability
1 272-7537 50amp connector (grey) 1 usually ships 13-16 days
2 272-7538 Fuse holder 2 usually ships 13-16 days
3 999-0496 Nut M8-1.25 nylon insert lock stainless steel 4 usually ships 11-14 days
4 N/A Not available 2 usually ships 3-26 days
5 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
6 572-3284 HARDWARE HANDLE BAR SUPP. KIT 3 (screw) usually ships 13-16 days
7 999-9097 Washer M8 flat stainless steel 4 usually ships 11-14 days
8 999-0497 Nut M6-1 nylon insert lock stainless steel 6 usually ships 11-14 days
9 999-0499 Bolt M8-1.25 x 20mm hex head full thread stainless steel 4 usually ships 11-14 days
11 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
12 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (washer) usually ships 13-16 days
13 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
14 572-3284 HARDWARE HANDLE BAR SUPP. KIT 6 (washer) usually ships 13-16 days
15 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
16 272-2572 30amp circuit breaker 1 usually ships 13-16 days
17 999-0250 Bolt M5-.8 x 10mm hex head full thread 5 usually ships 11-14 days
18 272-7541 12V vacuum motor 1 usually ships 13-16 days
19a 272-7542 Solenoid valve 1 (before SN 3510145009117) usually ships 13-16 days
19b 572-3374 SOLENOID VALVE 12V EV 1 (after SN3510145009118) usually ships 13-16 days
20 272-7543 Handle bracket 2 usually ships 1-5 days
21 272-7544 Support handle 1 usually ships 1-5 days
22 272-7545 Vacuum motor support (OBSOLETE) 1 usually ships 1-5 days
23 272-7532 Gasket 1 usually ships 13-16 days
24 272-7546 Vacuum motor gasket 1 usually ships 13-16 days
25 272-7547 Relay cover 1 usually ships 1-5 days
26 272-7548 Plunger block bracket 1 usually ships 1-5 days
27 272-7549 Vacuum motor cover 1 usually ships 13-16 days
28 272-7550 Vacuum motor gasket 1 usually ships 1-5 days
30 372-1233 Vacuum motor filter 1 usually ships 13-16 days
31 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (spacer) usually ships 13-16 days
32 999-1315 Screw M4-.7 x 8mm hex head stainless steel 2 usually ships 1-5 days
33 572-3243 BRUSH MOTOR CONTACTOR (OBSOLETE) 1 usually ships 13-16 days
34 572-3256 PLATE SUPPORT ELECTR.SWITCH 1 usually ships 13-16 days
35 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
36 572-3284 HARDWARE HANDLE BAR SUPP. KIT 3 (washer) usually ships 13-16 days
37 572-3284 HARDWARE HANDLE BAR SUPP. KIT 1 usually ships 13-16 days
38 272-7554 Vacuum motor casing 1 usually ships 13-16 days
39 272-7555 Vacuum motor lower casing 1 usually ships 13-16 days
40 999-0788 Screw M8-1.25 x 55mm hex head stainless steel 1 usually ships 11-14 days
41 999-0496 Nut M8-1.25 nylon insert lock stainless steel 1 usually ships 11-14 days
42 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (screw) usually ships 13-16 days
43 572-3284 HARDWARE HANDLE BAR SUPP. KIT 2 (clamp) usually ships 13-16 days
44 572-3284 HARDWARE HANDLE BAR SUPP. KIT 4 (clamp) usually ships 13-16 days
45 999-1647 Screw M6-1 x 16mm socket head stainless steel 2 usually ships 11-14 days
46 572-3284 HARDWARE HANDLE BAR SUPP. KIT 4 (washer) usually ships 13-16 days
47 999-9131 Nut M6 x 1 nylon lock stainless steel 2 usually ships 11-14 days
48 272-7539 12V relay 1 usually ships 13-16 days
49 272-7551 Cyclical timer 1 usually ships 13-16 days
50 272-7144 30amp fuse 1 usually ships 13-16 days
51 181-0962 5 amp fuse 1 usually ships 13-16 days
52 572-3228 HARNESS MACHINE (OBSOLETE) 1 usually ships 13-16 days
53 272-7557 Battery harness 1 usually ships 13-16 days
KIT 1 572-3284 HARDWARE HANDLE BAR SUPP. KIT (includes 3, 5-15,17,31,32,35,36 and 40-47) usually ships 13-16 days

Wiring Diagram

#PartDescription ReqNotesAvailability
BAT 162-0042 12V 115Ah AGM battery (Group 31) (SNSR) usually ships 25-34 days
CH 572-3824 CHARGER BATT O/B 12V 12A 100-2 usually ships 13-16 days
EB1 272-7562 LED Board usually ships 13-16 days
ES1 572-3243 BRUSH MOTOR CONTACTOR (OBSOLETE) usually ships 13-16 days
ES2 272-7539 12V relay usually ships 13-16 days
EV 272-7542 Solenoid valve (before SN 3510145009117) usually ships 13-16 days
EV 572-3374 SOLENOID VALVE 12V EV (after SN 3510145009118) usually ships 13-16 days
F1 272-2572 30amp circuit breaker usually ships 13-16 days
F2 272-7144 30amp fuse usually ships 13-16 days
F3 181-0962 5 amp fuse usually ships 13-16 days
M1 572-3204 REDUCTION GEARMOTOR KIT 12V (OBSOLETE) usually ships 13-16 days
M2 272-7541 12V vacuum motor usually ships 13-16 days
SW1 572-3232 SWITCH ROTATIVE 4 POSITION SW1 (OBSOLETE) usually ships 13-16 days
SW2 272-8640 Switch usually ships 13-16 days
SW3 272-7561 Pump switch (OBSOLETE) usually ships 13-16 days