- Batteries

#PartDescription ReqNotesAvailability
1 162-0011 12V 105Ah wet battery (SNSR) 2 usually ships 25-34 days
2 162-0042 12V 115Ah AGM battery (Group 31) (SNSR) 2 usually ships 25-34 days

- Batteries, Brushes and Chargers

#PartDescription ReqNotesAvailability
01 162-0011 12V 105Ah wet battery (SNSR) 2 usually ships 25-34 days
02 162-0042 12V 115Ah AGM battery (Group 31) (SNSR) 2 usually ships 25-34 days
03 162-5124 24V 12amp smart battery charger with small SB50 red plug 1 (dual mode charger; can be changed to support AGM and wet batteries) usually ships 12-13 days
04 162-5124 24V 12amp smart battery charger with small SB50 red plug 1 usually ships 12-13 days
05 991-9284 50amp charger plug SB50 with pins (red) 1 usually ships 13-17 days
06 996-0664 Medium polypropelene scrubbing brush 1 usually ships 13-16 days
07 996-0705 Lite polypropelene scrubbing brush 1 usually ships 13-16 days
08 996-0841 Union mix polypropelene scrubbing brush 1 usually ships 13-16 days
09 996-0663 Medium grit scrubbing brush - 180 grit 1 usually ships 13-16 days
10 572-3912 BRUSH MED GRIT 20 1 usually ships 13-16 days
11 991-2206 Center-Lok 3 pad holder 1 usually ships 13-17 days
12a 991-2202 Big mouth pad holder set (blue) 1 usually ships 14-24 days
12b 991-2201 Center-Lok II pad holder - right hand thread (black) 1 (NON-OEM) usually ships 13-17 days
12c 991-2205 Deep lock ring and pad grip ring 1 (NON-OEM) usually ships 17-22 days
12d 991-2214 Center-Lok II pad holder - left hand thread (red) 1 (NON-OEM) usually ships 14-24 days
13 996-0338 Clutch plate 1 usually ships 14-24 days
14 996-0666 Pad driver assembly 1 usually ships 13-16 days

- Chargers

#PartDescription ReqNotesAvailability
2 991-9284 50amp charger plug SB50 with pins (red) 1 usually ships 13-17 days
3a 162-5079 SCR assembly kit 1 usually ships 22-30 days
3b 372-1254 Fuse assembly 1 usually ships 13-16 days
4 162-5087 AC cord set kit 1 usually ships 22-30 days
5 162-5081 Control board assembly 1 usually ships 22-30 days

- Frequently Replaced Parts

#PartDescription ReqNotesAvailability
1 162-0011 12V 105Ah wet battery (SNSR) (2) usually ships 25-34 days
2 162-0042 12V 115Ah AGM battery (Group 31) (SNSR) (2) usually ships 25-34 days
4 991-9284 50amp charger plug SB50 with pins (red) usually ships 13-17 days
5 998-0010 Battery jumper cable - ring type (red) usually ships 13-17 days
6 172-1853 Key switch assembly (power) usually ships 13-16 days
7 172-1852 Replacement key (OBSOLETE) usually ships 1-5 days
9 272-1979 Solenoid valve assembly usually ships 13-16 days
10 181-0924 Solution filter assembly usually ships 13-16 days
11 272-2026 Squeegee blade kit gum rubber usually ships 13-16 days
12 272-1965 Vacuum hose usually ships 13-16 days
13 172-4244 Tank lid with gasket (OBSOLETE) usually ships 1-5 days
15 272-9628 Drain hose kit usually ships 30-32 days
16 272-5294 24V vacuum motor (OEM) usually ships 13-16 days
17 991-1203 24V 2 stage vacuum motor tangential usually ships 13-17 days
18 991-1224 Plastic covered carbon brush (sold individually) usually ships 13-17 days
19 996-6157 19 inch daily cleaning brush usually ships 14-24 days
20 996-1868 18 inch lite grit scrubbing brush - 500 grit usually ships 1-5 days
21 996-1866 18 inch medium grit scrubbing brush - 180 grit usually ships 1-5 days
22 996-6092 18 inch heavy grit stripping brush - 80 grit usually ships 14-24 days
23 996-0666 Pad driver assembly usually ships 13-16 days
24 996-0338 Clutch plate usually ships 14-24 days
25 991-2206 Center-Lok 3 pad holder usually ships 13-17 days

- Pad Holders

#PartDescription ReqNotesAvailability
1 991-2214 Center-Lok II pad holder - left hand thread (red) usually ships 14-24 days
2a 991-2201 Center-Lok II pad holder - right hand thread (black) (Pad driver side female, Floor side male) usually ships 13-17 days
2b 991-8577 Pad retainer (Pad driver side male, Floor side female) usually ships 13-17 days
3a 991-2202 Big mouth pad holder set (blue) (includes 3 screws) usually ships 14-24 days
3b 991-2205 Deep lock ring and pad grip ring usually ships 17-22 days
4 991-2203 Big mouth pad holder male thread portion usually ships 17-22 days
5 991-2206 Center-Lok 3 pad holder (includes 3 screws) usually ships 13-17 days
6 996-0372 Big mouth pad holder (left hand thread) usually ships 14-24 days
7 N/A Not available usually ships 3-26 days
8 991-2209 Split retainer - pad holder ring (OBSOLETE) usually ships 13-17 days
9 N/A Not available (replaced by #3 991-2202) usually ships 3-26 days
10 991-2211 Center lock pad holding cup (male) (yellow) (OBSOLETE) usually ships 17-22 days

- Pads

#PartDescription ReqNotesAvailability
01 255-2040 20 inch aqua plus burnishing pad (pkg of 5) usually ships 32-33 days
02 255-2035 20 inch Armadillo concrete scrubbing pad (pkg 5) (OBSOLETE) usually ships 32-33 days
03 255-2064 20 inch Blue ace pad (pkg of 5) usually ships 32-33 days
04 255-2042 20 inch Blue Jay burnishing pad (pkg of 5) usually ships 32-33 days
05 255-2012 20 inch Cure white pad (pkg of 5) usually ships 32-33 days
06 255-2077 20 inch Diamondback extreme stripping pad (pkg of 5) usually ships 32-33 days
07 255-2038 20 inch EHD Extra Heavy Duty Concrete Leveling Pad (pkg of 2 usually ships 32-33 days
08 255-2021 20 inch gorilla lite burnishing pad (pkg of 5) usually ships 32-33 days
09 255-2050 20 inch gorilla spray buff/polish/burnish pad (pkg of 5) usually ships 32-33 days
10 255-2065 20 inch Heat concrete bonding pad (pkg of 5) usually ships 32-33 days
11 255-2030 20 inch jaguar burnishing pad (pkg of 5) usually ships 32-33 days
12 255-2067 20 inch Laminated 2001 Gorilla polish pad (pkg of 5) usually ships 32-33 days
13 255-2087 20 inch Melamine Mela-Kleen pad (pkg of 2)         usually ships 32-33 days
14 255-2068 20 inch Microclean daily cleaning pad (pkg of 2) usually ships 32-33 days
15 255-2069 20 inch Micropolish polishing and burnishing pad (pkg of 2) usually ships 32-33 days
16 255-2090 20 inch premium black stripping pad (pkg of 5) usually ships 32-33 days
17 255-2070 20 inch premium blue cleaning pad (pkg of 5) usually ships 32-33 days
18 255-2092 20 inch premium brown stripping pad (pkg of 5) usually ships 32-33 days
19 255-2080 20 inch premium green scrubbing pad (pkg of 5) usually ships 32-33 days
20 255-2060 20 inch premium red scrubbing pad (pkg of 5) usually ships 32-33 days
21 255-2052 20 inch premium tan polishing pad (pkg of 5) usually ships 32-33 days
22 255-2020 20 inch premium white polishing pad (pkg of 5) usually ships 32-33 days
23 255-2011 20 inch superspeed rubberized pad (pkg of 5) usually ships 32-33 days
24 255-2095 20 inch razorback stripping pad (pkg of 5) usually ships 32-33 days
25 255-2047 20 inch Redwood maroon floor prep pad (pkg of 10) usually ships 32-33 days
26 255-2055 20 inch Ruff non-abrasive brush pad (pkg of 2) usually ships 32-33 days
27 255-2023 20 inch sand screen driver pad (pkg of 2) usually ships 32-33 days
28 255-0157 20 inch Professional sand screen 100 grit (pkg of 10) usually ships 32-33 days
29 255-0021 20 inch Professional sand screen 120 grit (pkg of 10) usually ships 32-33 days
30 255-0158 20 inch Professional sand screen 150 grit (pkg of 10) usually ships 32-33 days
31 255-0159 20 inch Professional sand screen 180 grit (pkg of 10) usually ships 32-33 days
32 255-0160 20 inch Professional sand screen 220 grit (pkg of 10) usually ships 32-33 days
33 255-0161 20 inch Professional sand screen 400 grit (pkg of 10) usually ships 32-33 days
34 255-0030 20 inch Professional sand screen 60 grit (pkg of 10) usually ships 32-33 days
35 255-0020 20 inch Professional sand screen 80 grit (pkg of 10) usually ships 32-33 days
36 255-0249 20 inch Superscreen sand screen 100 grit (pkg of 10) usually ships 32-33 days
37 255-0250 20 inch Superscreen sand screen 120 grit (pkg of 10) usually ships 32-33 days
38 255-0251 20 inch Superscreen sand screen 150 grit (pkg of 10) usually ships 32-33 days
39 255-0252 20 inch Superscreen sand screen 180 grit (pkg of 10) usually ships 32-33 days
40 255-0253 20 inch Superscreen sand screen 220 grit (pkg10) (OBSOLETE) usually ships 32-33 days
41 255-0254 20 inch Superscreen sand screen 400 grit (pkg of 10) usually ships 32-33 days
42 255-0247 20 inch Superscreen sand screen 60 grit (pkg of 10) usually ships 32-33 days
43 255-0248 20 inch Superscreen sand screen 80 grit (pkg of 10) usually ships 32-33 days
45 255-9591 20 inch Diamond by Gorilla 11000 Grit (pkg of 2) usually ships 32-33 days
46 255-9588 20 inch Diamond by Gorilla 1500 Grit (pkg of 2) usually ships 32-33 days
47 255-9585 20 inch Diamond by Gorilla 200 Grit (pkg of 2) usually ships 32-33 days
48 255-9589 20 inch Diamond by Gorilla 3000 Grit (pkg of 2) usually ships 32-33 days
49 255-9586 20 inch Diamond by Gorilla 400 Grit (pkg of 2) usually ships 32-33 days
50 255-9587 20 inch Diamond by Gorilla 800 Grit (pkg of 2) usually ships 32-33 days
51 255-9590 20 inch Diamond by Gorilla 8000 Grit (pkg of 2) usually ships 32-33 days
52 255-9645 20 inch Diamond starter pack (1 of each grit) usually ships 32-33 days
53 255-2082 20 inch Turbostrip segmented rotary pad(OBSOLETE) usually ships 32-33 days
54 255-2015 20 inch Duala clean and shine pad - low speed (pkg of 5) usually ships 32-33 days
55 255-2016 20in 2001 Duala clean& shine pad-high speed(pkg 5) (OBSOLETE usually ships 32-33 days

Brush Drive Assembly

#PartDescription ReqNotesAvailability
001 N/A Not available 1 (Cylinder wire screen) usually ships 3-26 days
002 N/A Not available 2 (Cable tie) usually ships 3-26 days
003 272-1905 Brush motor cap (OBSOLETE) 1 usually ships 1-5 days
004 272-1906 Terminal block (OBSOLETE) 1 usually ships 1-5 days
005 272-1907 Spiral pin (OBSOLETE) 1 usually ships 1-5 days
006a N/A Not available 1 (24V brush motor) (includes 004, 005, 006b) usually ships 3-26 days
006b 272-1908 Brush motor (OBSOLETE) 1 usually ships 1-5 days
009 181-0942 Square keyway 1 usually ships 13-16 days
010 272-2571 Brush gear motor assembly 1 Includes 001, 002, 004, 005, 006, and 009. Gear box no longer sold separately. usually ships 13-16 days
020 272-1914 Screw M6-1 x 16mm hex head 4 usually ships 1-5 days
025 272-7136 Bushing (OBSOLETE) 4 usually ships 13-16 days
030 999-1267 Washer M8 flat zinc 4 usually ships 11-14 days
035 999-0517 Bolt M8-1.25 x 16mm hex head full thread zinc 4 usually ships 11-14 days
040 999-0579 Nut M8-1.25 hex coarse thread zinc 1 usually ships 11-14 days
045 272-1919 Vibration damping M8 (set of 2) 1 usually ships 13-16 days
050 999-0517 Bolt M8-1.25 x 16mm hex head full thread zinc 1 usually ships 11-14 days
055 272-1920 Base plate (OBSOLETE) 1 usually ships 1-5 days
060 272-1921 Brush cover (OBSOLETE) 1 usually ships 13-16 days
065 172-1686 Spacer (OBSOLETE) 7 usually ships 1-5 days
070 272-1923 Screw M6-1 x 12mm hex head 7 usually ships 1-5 days
075 572-9298 Polygonal flange 1 usually ships 13-16 days
080 272-0758 Washer M6 flat (OBSOLETE) 1 usually ships 1-5 days
090 999-0581 Bolt M8-1.25 x 25mm hex head full thread zinc 1 usually ships 11-14 days
095 172-0469 Brush hub 1 usually ships 13-16 days
100 172-4471 Washer M6 3 usually ships 1-5 days
105 272-1928 Screw cylinder 3 usually ships 13-16 days
110 272-8031 Plug 2 usually ships 13-16 days
115 272-1930 Nut M5 hex 2 usually ships 1-5 days
120 272-1931 Knob 2 usually ships 13-16 days
125 999-0006 Washer 3/16 flat zinc plated 2 usually ships 11-14 days
127 272-1933 Rubber gasket (OBSOLETE) 2 usually ships 13-16 days
130 272-1934 Adjustment screw 2 usually ships 13-16 days
140 272-1935 Frame (OBSOLETE) 1 usually ships 1-5 days
145 N/A Not available 1 (Plate) usually ships 3-26 days
150 272-1937 Screw M6-1 x 25mm hex head 2 usually ships 1-5 days
155 272-7135 Buffer 2 usually ships 13-16 days
156 272-1939 Vibration damping plate 1 usually ships 13-16 days
160 272-1941 Screw M8-1.25 x 12mm countersunk head (OBSOLETE) 2 usually ships 1-5 days
165 172-4695 Locking tank cap 2 usually ships 13-16 days
170 999-0581 Bolt M8-1.25 x 25mm hex head full thread zinc 2 usually ships 11-14 days
175 999-1267 Washer M8 flat zinc 2 usually ships 11-14 days
177 272-1944 Washer spring 2 usually ships 1-5 days
180 272-1945 Sleeve bushing (OBSOLETE) 2 usually ships 1-5 days
185 272-1666 Bumper roller 2 usually ships 13-16 days
190 N/A Not available 1 (Fitting strip) usually ships 3-26 days
KIT 272-1940 Isolator kit 1 Inlcudes 150, 156, 155 usually ships 13-16 days

Chassis Assembly

#PartDescription ReqNotesAvailability
001 172-2370 Right tank axle 1 usually ships 1-5 days
005 272-1923 Screw M6-1 x 12mm hex head 4 usually ships 1-5 days
010 172-2371 Chassis (OBSOLETE) 1 usually ships 1-5 days
014 172-2372 Nut hex 1 usually ships 1-5 days
016a 272-2712 Caster wheel kit 1 Includes 014 usually ships 13-16 days
016b 272-2712 Caster wheel kit 1 usually ships 13-16 days
017a N/A Not available 1 usually ships 3-26 days
017b 172-2374 Tank closure kit (OBSOLETE) 1 usually ships 13-16 days
019 181-0914 Spacer 1 usually ships 1-5 days
020 172-2375 Left tank axle (OBSOLETE) 1 usually ships 1-5 days
021 272-8091 Allen wrench 1 usually ships 1-5 days
022 272-8093 Cable guide 1 usually ships 1-5 days
023 172-2376 Reinforced seal (OBSOLETE) 1 usually ships 1-5 days
024 172-2377 Seal (OBSOLETE) 1 usually ships 1-5 days
025 172-2378 Screw hex (OBSOLETE) 2 usually ships 1-5 days
026 999-1262 Washer M10 flat 2 usually ships 11-14 days
030a 172-2379 Drive wheel with traction (OBSOLETE) 2 After SN 1650148 usually ships 13-16 days
030b 181-0671 Foam filled drive wheel and hub (OBSOLETE) 2 Before SN 1650149 usually ships 13-16 days
035 272-1923 Screw M6-1 x 12mm hex head 4 usually ships 1-5 days
040 272-2706 Drive motor 1 usually ships 9-12 days
041 172-2381 Retaining ring (OBSOLETE) 2 usually ships 1-5 days
045 272-0751 Feather key 2 usually ships 13-16 days
050 172-2383 Ball bearing 1 usually ships 13-16 days
053 172-2384 Washer lock (OBSOLETE) 2 usually ships 1-5 days
055 172-2385 Bearing support 1 usually ships 1-5 days
060 172-2386 Washer lock 2 usually ships 1-5 days
065 172-2387 Washer 1 usually ships 1-5 days
080 172-2367 Screw M8-1.25 x 20mm flat head 2 usually ships 1-5 days
085 272-8089 Spacer 2 usually ships 13-16 days
090 172-2368 Wheel with hub 2 usually ships 13-16 days
095 N/A Not available 2 (Wheel stud) usually ships 3-26 days
100 272-1914 Screw M6-1 x 16mm hex head 4 usually ships 1-5 days

Control Panel Assembly

#PartDescription ReqNotesAvailability
001a N/A Not available 1 Without traction; includes 002a and 003 usually ships 3-26 days
001b 172-2404 Switch panel (OBSOLETE) 1 Without traction; includes 002b and 003 usually ships 1-5 days
002a 272-2713 Control panel decal (OBSOLETE) 1 Without traction usually ships 1-5 days
002b 272-2714 Control panel decal (OBSOLETE) 1 Without traction usually ships 1-5 days
003 172-4494 Control panel (OBSOLETE) 1 usually ships 13-16 days
005 172-2396 Washer 4 x 9 flat (OBSOLETE) 4 usually ships 1-5 days
010 N/A Not available 4 Screw usually ships 3-26 days
021 172-0805 Switch boots with seal 1 usually ships 13-16 days
022 272-2708 Switch kit 1 usually ships 13-16 days
030 272-9274 24V hour meter 1 usually ships 13-16 days
035 999-0869 Nut M4-.7 hex coarse thread plain finish 2 usually ships 11-14 days
040 999-0537 Screw 10-24 x 1/4 socket head shoulder 2 usually ships 11-14 days

Control Panel Assembly with Key Switch

#PartDescription ReqNotesAvailability
001a N/A Not available 1 Without traction; includes 002a & 003 usually ships 3-26 days
001b 172-2404 Switch panel (OBSOLETE) 1 Without traction; includes 002b & 003 usually ships 1-5 days
002a 272-2713 Control panel decal (OBSOLETE) 1 Without traction usually ships 1-5 days
002b 272-2714 Control panel decal (OBSOLETE) 1 Without traction usually ships 1-5 days
003 172-4494 Control panel (OBSOLETE) 1 usually ships 13-16 days
005 172-2396 Washer 4 x 9 flat (OBSOLETE) 4 usually ships 1-5 days
010 N/A Not available 4 Screw usually ships 3-26 days
015a 172-1853 Key switch assembly 1 usually ships 13-16 days
015b 172-1852 Replacement key (OBSOLETE) 1 usually ships 1-5 days
015b 172-1857 Micro switch (OBSOLETE) 1 usually ships 13-16 days
021 172-0805 Switch boots with seal 1 usually ships 13-16 days
022 272-2708 Switch kit 1 usually ships 13-16 days
025 272-2566 Knob (OBSOLETE) 1 usually ships 13-16 days
030 272-9274 24V hour meter 1 usually ships 13-16 days
031 999-9089 Washer M4 flat stainless steel 2 usually ships 11-14 days
033 172-2399 Terminal block (OBSOLETE) 1 usually ships 1-5 days
034 172-2398 Screw M3-.5 x 25 phillips pan head (OBSOLETE) 1 usually ships 1-5 days
035 999-0869 Nut M4-.7 hex coarse thread plain finish 2 usually ships 11-14 days
040 999-0537 Screw 10-24 x 1/4 socket head shoulder 2 usually ships 11-14 days
041 999-0768 Nut M3-.5 hex coarse thread plain finish 1 usually ships 11-14 days

Lifting Pedal Assembly

#PartDescription ReqNotesAvailability
001 272-1983 Rubber pedal pad 1 usually ships 13-16 days
003a 272-1984 Pedal weldment 1 usually ships 1-5 days
003b 272-1985 Pedal assembly 1 Includes 001 & 003a usually ships 1-5 days
010 272-8092 Spacer 2 usually ships 1-5 days
015 999-1267 Washer M8 flat zinc 3 usually ships 11-14 days
020 999-0581 Bolt M8-1.25 x 25mm hex head full thread zinc 1 usually ships 11-14 days
025 999-0581 Bolt M8-1.25 x 25mm hex head full thread zinc 1 usually ships 11-14 days
030 999-0471 Nut M8-1.25 nylon insert lock zinc plated 2 usually ships 11-14 days
035 172-4496 Washer 2 usually ships 13-16 days
040 272-1989 Lever 1 usually ships 1-5 days

Solution Assembly

#PartDescription ReqNotesAvailability
001a 272-1961 Lever with cable (OBSOLETE) 1 usually ships 13-16 days
001b 272-1960 Grip 1 usually ships 13-16 days
006 272-9628 Drain hose kit 1 Recovery usually ships 30-32 days
015 997-2008 Hose clamp 1 usually ships 7-8 days
020 181-0916 Fresh water hose kit 1 (Solution) The T piece the hoses connect to is no longer available. This kit is used to eliminate that part. usually ships 13-16 days
021 181-0916 Fresh water hose kit 1 (Solution) The T piece the hoses connect to is no longer available. This kit is used to eliminate that part. usually ships 13-16 days
025 272-1965 Vacuum hose 1 usually ships 13-16 days
030 172-2093 Inlet filter 1 usually ships 13-16 days
035 181-0916 Fresh water hose kit 1 (Solution) The T piece the hoses connect to is no longer available. This kit is used to eliminate that part. usually ships 13-16 days
038 997-2000 Hose clamp 1 usually ships 7-8 days
039 181-0904 Elbow drain hose kit (OBSOLETE) 1 usually ships 13-16 days
040 272-1923 Screw M6-1 x 12mm hex head 2 usually ships 1-5 days
050 181-0916 Fresh water hose kit 1 (Solution) The T piece the hoses connect to is no longer available. This kit is used to eliminate that part. usually ships 13-16 days
055 172-3796 Screw M4-.7 x 8mm 2 usually ships 1-5 days
056a 272-1970 Hose assembly 1 Includes 055 & 056 usually ships 13-16 days
056b 272-1969 Copper hose (OBSOLETE) 1 usually ships 1-5 days
070 272-1973 Drain hose assembly (OBSOLETE) 1 Includes 006, 038, 039 usually ships 13-16 days
075 N/A Not available 2 (Screw M4-.7 x 10mm flat head phillips) usually ships 3-26 days
080 272-7117 Nut 1 usually ships 1-5 days
085 N/A Not available 1 Ball grip usually ships 3-26 days
090 272-1978 Rubber barb 2 usually ships 13-16 days
095 272-1979 Solenoid valve assembly 1 Includes 075, 080, 085, 090, 100 & 106 usually ships 13-16 days
101 181-0924 Solution filter assembly 2 (Hosebarb no longer sold alone.) usually ships 13-16 days
106 181-0921 24V solenoid valve 1 usually ships 13-16 days
KIT 181-0924 Solution filter assembly 1 Includes 030 & 101 usually ships 13-16 days
KIT 181-0916 Fresh water hose kit (Solution) The T piece the hoses connect to is no longer available. This kit is used to eliminate that part. usually ships 13-16 days

Squeegee Assembly

#PartDescription ReqNotesAvailability
001 272-1995 Linkage arm assembly (OBSOLETE) 1 usually ships 13-16 days
002 272-1996 Squeegee support plate (OBSOLETE) 1 usually ships 13-16 days
004 999-1263 Bolt M10-1.5 x 70mm hex head 1 usually ships 11-14 days
005 999-1262 Washer M10 flat 1 usually ships 11-14 days
007 272-2000 Washer M15 x 25mm plain nylon 2 usually ships 13-16 days
008 999-0767 Nut M10-1.5 hex coarse thread 1 usually ships 11-14 days
009 272-2002 Spacer (OBSOLETE) 1 usually ships 13-16 days
010 272-2003 Squeegee mounting weldment assembly (OBSOLETE) 1 usually ships 13-16 days
011 272-2004 Squeegee mounting bracket 1 usually ships 1-5 days
012a 272-2005 Knob (OBSOLETE) 1 usually ships 13-16 days
012b 272-2008 Adjustment screw kit 1 (includes 012, 013, 014 and 016) usually ships 13-16 days
013 272-4756 Nut 2 usually ships 1-5 days
014 272-2007 Spacer 1 usually ships 13-16 days
016 272-2009 Pin 1 usually ships 13-16 days
017 272-6638 Left rear strap (OBSOLETE) 1 usually ships 13-16 days
018 172-4099 Nut 5/16-18 thumb 2 usually ships 13-16 days
020 172-4207 Screw M5 x 20mm hex head stainless steel (OBSOLETE) 4 usually ships 1-5 days
021 999-1579 Screw M6 x 80mm hex head stainless steel 2 usually ships 11-14 days
022 999-1261 Washer M6 flat stainless steel 2 usually ships 11-14 days
023 172-0274 Guide wheel 4 usually ships 13-16 days
024 172-0095 Bushing 2 usually ships 13-16 days
026a 272-2026 Squeegee blade kit gum rubber 1 (OEM)(Individual blade is no longer available alone) usually ships 13-16 days
026b 991-3110 20 inch squeegee blade kit Linatex 1 (NON-OEM) usually ships 30-32 days
027 272-2013 Front strap (OBSOLETE) 1 usually ships 13-16 days
028 999-0497 Nut M6-1 nylon insert lock stainless steel 8 usually ships 11-14 days
029 999-0497 Nut M6-1 nylon insert lock stainless steel 4 usually ships 11-14 days
030 172-2335 Roller assembly (OBSOLETE) 2 usually ships 13-16 days
031a 272-2026 Squeegee blade kit gum rubber 1 (Individual blade is no longer available alone) usually ships 13-16 days
031b 991-3110 20 inch squeegee blade kit Linatex 1 (NON-OEM) usually ships 30-32 days
032 172-0498 Right rear strap (OBSOLETE) 1 usually ships 13-16 days
033 999-0938 Nut M6 wing stainless steel 2 usually ships 11-14 days
034 172-4204 Screw M4-.7 x 10mm stainless steel 2 usually ships 1-5 days
035 172-0094 Latch 1 usually ships 13-16 days
036 999-0954 Nut M4-.7 nylon insert lock stainless steel 2 usually ships 11-14 days
037 272-2017 Wheel bracket (OBSOLETE) 2 usually ships 1-5 days
038 181-0936 Squeegee wheel kit 2 usually ships 13-16 days
039 272-0771 Screw M5 x 45 hex head stainless steel 4 usually ships 1-5 days
040 272-2020 Squeegee assembly 1 usually ships 13-16 days
042 272-2022 Spacer (OBSOLETE) 2 usually ships 1-5 days
043 N/A Not available 2 (Washer M7 thick rubber) usually ships 3-26 days
044 272-1937 Screw M6-1 x 25mm hex head 2 usually ships 1-5 days

Squeegee Lift Assembly

#PartDescription ReqNotesAvailability
001 272-1990 Ball grip 1 usually ships 13-16 days
005 272-1991 Squeegee lever (OBSOLETE) 1 usually ships 13-16 days
010 272-1992 Cap (OBSOLETE) 2 usually ships 13-16 days
015 272-1993 Squeegee lift cable 1 usually ships 13-16 days
020 999-0497 Nut M6-1 nylon insert lock stainless steel 1 usually ships 11-14 days
025 N/A Not available 2 (Washer M7 thick rubber) usually ships 3-26 days
030 999-0502 Bolt M6-1 x 20mm hex head full thread zinc 1 usually ships 11-14 days

Switch Housing Assembly

#PartDescription ReqNotesAvailability
001 272-1947 Screw flat head 4 usually ships 13-16 days
005 272-1948 Front switch housing (OBSOLETE) 1 usually ships 13-16 days
015 999-0335 Washer 1/4 x 5/8 SAE flat stainless steel 1 usually ships 11-14 days
020 272-1950 Washer M5 x 25mm plastic 4 usually ships 1-5 days
025 172-2036 Compression spring 2 usually ships 13-16 days
030 272-1951 Sleeve 1 usually ships 1-5 days
045 999-0537 Screw 10-24 x 1/4 socket head shoulder 1 usually ships 11-14 days
050 172-2047 U clamp 1 (potentiometer is for drive models only) usually ships 13-16 days
055 272-1954 Handle bar (OBSOLETE) 1 usually ships 1-5 days
060 172-4493 Rear switch housing 1 usually ships 13-16 days
065 999-1991 Screw M6-1.0 x 50mm pan head phillips zinc 1 usually ships 11-14 days
070 272-1957 Screw M4-.7 x 14mm 2 usually ships 1-5 days
075 272-1958 Clamp 2 usually ships 13-16 days
077a 999-0738 Screw M3-.5 x 16mm pan head phillips zinc 4 BA 5321D usually ships 11-14 days
077b 999-0738 Screw M3-.5 x 16mm pan head phillips zinc 1 BA 5321 usually ships 11-14 days
078a 272-6318 Micro switch cam 2 BA 5321D usually ships 13-16 days
078b 272-6318 Micro switch cam 1 BA 5321 usually ships 13-16 days
080 999-0518 Bolt M6-1 x 25mm hex head full thread zinc 1 usually ships 11-14 days

Tank Assembly

#PartDescription ReqNotesAvailability
002 172-4244 Tank lid with gasket (OBSOLETE) 1 usually ships 1-5 days
010 N/A Not available 2 (Washer lock) usually ships 3-26 days
011a 172-4238 Axle (OBSOLETE) 1 usually ships 1-5 days
011b 172-4245 Axle assembly (OBSOLETE) 1 Includes 010 & 011a usually ships 1-5 days
020 272-0231 Retaining ring (OBSOLETE) 2 usually ships 1-5 days
025 999-6713 Washer M10 x 30mm flat stainless steel 2 usually ships 11-14 days
030 272-0233 Screw hex head (OBSOLETE) 2 (Screw) usually ships 1-5 days
040 272-8073 Acoustic insulation (OBSOLETE) 1 usually ships 1-5 days
045 N/A Not available 1 (Upper accoustic foam) usually ships 3-26 days
046 172-4499 Insulating panel (OBSOLETE) 1 usually ships 13-16 days
050a 172-4475 Cover with seal assembly (OBSOLETE) 1 Includes 046 usually ships 1-5 days
050b 272-0235 Acoustic cover assembly with seal and screw (OBSOLETE) 1 Includes 046 & 055 usually ships 1-5 days
055 172-2391 Screw M3-.5 x 12mm (OBSOLETE) 6 usually ships 1-5 days
063 N/A Not available 1 (Pre-filter and screw cover) usually ships 3-26 days
065 172-4466 Filter 1 usually ships 13-16 days
070 172-8883 Screen (OBSOLETE) 1 usually ships 13-16 days
071 172-4200 Screw 3.5 x 10 (OBSOLETE) 2 usually ships 1-5 days
072 272-0237 Filter housing (OBSOLETE) 1 usually ships 1-5 days
080 272-0238 Pre-filter assembly (OBSOLETE) 1 usually ships 1-5 days
082 N/A Not available 2 (O-ring) usually ships 3-26 days
083 272-1971 Sleeve 1 usually ships 1-5 days
085 172-0192 Float ball 1 usually ships 18-27 days
090 172-0517 Float cage half (2 required for full float cage) 2 usually ships 13-16 days
095 172-4242 Fitting screw 2 usually ships 1-5 days
100 N/A Not available 2 (Washer M7 thick rubber) usually ships 3-26 days
102 172-5078 Tank adjustment pin (OBSOLETE) 1 usually ships 1-5 days
105 272-0601 Rod assembly 1 Includes 095, 100 & 105 usually ships 1-5 days
121 272-4243 1/4 inch tee fitting (OBSOLETE) 1 usually ships 1-5 days
130 272-0240 Bumper roller (OBSOLETE) 2 usually ships 13-16 days
135 N/A Not available 2 (Axle) usually ships 3-26 days
140 272-0242 Retaining ring (OBSOLETE) 2 usually ships 1-5 days
145 N/A Not available 2 (Flange bushing) usually ships 3-26 days
146 272-0244 Bumper roller assembly (OBSOLETE) 2 Includes 130, 135, 140, 145 usually ships 1-5 days
150 999-0335 Washer 1/4 x 5/8 SAE flat stainless steel 3 usually ships 11-14 days
152 999-0502 Bolt M6-1 x 20mm hex head full thread zinc 3 usually ships 11-14 days
155 272-5294 24V vacuum motor 1 Includes 150, 152, 156, 160, 165, 170 usually ships 13-16 days
156a 272-5294 24V vacuum motor 1 OEM usually ships 13-16 days
156b 991-1203 24V 2 stage vacuum motor tangential 1 (NON-OEM) usually ships 13-17 days
156c 272-9921 Splash guard with bristles 1 usually ships 13-16 days
160 272-8072 Vacuum motor gasket 1 usually ships 13-16 days
165 272-8071 Spacer (OBSOLETE) 3 usually ships 13-16 days
170 181-1722 Buffer (OBSOLETE) 3 usually ships 1-5 days
171 272-0249 Acoustic insulation (OBSOLETE) 1 usually ships 1-5 days
180 N/A Not available 2 (Washer) usually ships 3-26 days
183 N/A Not available 1 Washer usually ships 3-26 days
185 272-8089 Spacer 2 usually ships 13-16 days
190 172-2367 Screw M8-1.25 x 20mm flat head 2 usually ships 1-5 days
200 272-0247 Right tank reinforce assembly (OBSOLETE) 1 usually ships 1-5 days
201 272-0248 Left tank reinforce assembly (OBSOLETE) 1 usually ships 1-5 days

Wiring Diagram before SN 1514570 2 of 2

#PartDescription ReqNotesAvailability
0.9835 172-1857 Micro switch (OBSOLETE) usually ships 13-16 days

Wiring System 1

#PartDescription ReqNotesAvailability
001 172-4202 Snap swith complete 1 usually ships 1-5 days
002 272-2693 Clamp (OBSOLETE) 1 usually ships 13-16 days
003 999-0738 Screw M3-.5 x 16mm pan head phillips zinc 2 usually ships 11-14 days
004 472-1280 CONTACT F MICROSWITCH PKD 1 usually ships 13-16 days
005 272-2709 Paddle microswitch 1 usually ships 1-5 days
010 172-2420 Terminal block 3 usually ships 1-5 days
015 N/A Not available 1 (Turbine cable) (included with 052) usually ships 3-26 days
016 272-1906 Terminal block (OBSOLETE) 1 usually ships 1-5 days
020 N/A Not available 1 (Brush motor cable) usually ships 3-26 days
025 172-2423 Traction card 1 usually ships 1-5 days
031 172-2424 Electronic board (OBSOLETE) 1 usually ships 13-16 days
034 172-2425 Gasket (OBSOLETE) 1 usually ships 1-5 days
035 N/A Not available 1 (Cover assembly) (includes 034, 037 and 036) usually ships 3-26 days
036 N/A Not available 4 (Screw) usually ships 3-26 days
037 272-5509 Electronic cover card 1 usually ships 13-16 days
038 272-2710 Batteries selector 1 usually ships 1-5 days
040 272-2705 Battery status led 1 usually ships 1-5 days
041 172-2399 Terminal block (OBSOLETE) 1 usually ships 1-5 days
045 N/A Not available 1 Main harness usually ships 3-26 days
050 272-2717 Electronic support system (OBSOLETE) 1 usually ships 1-5 days
051 181-0965 Contactor (OBSOLETE) 2 usually ships 13-16 days
053 272-2718 Wet gel label (OBSOLETE) 1 usually ships 1-5 days
054 172-2430 Spacer (OBSOLETE) 1 usually ships 1-5 days
057 172-2039 5K potentiometer 1 (potentiometer is for drive models only) usually ships 13-16 days
058 172-2440 Potentiometer - speed controller 1 (potentiometer is for drive models only) usually ships 13-16 days

Wiring System 2

#PartDescription ReqNotesAvailability
005 N/A Not available 4 (Insulator cap) usually ships 3-26 days
006 N/A Not available 1 (Machine harness) usually ships 3-26 days
007 172-2437 Red strand (OBSOLETE) 1 usually ships 1-5 days
008 172-2442 Terminal block (OBSOLETE) 1 usually ships 1-5 days
010 272-5517 Battery spacer 1 usually ships 13-16 days
015 172-2436 Lead cable (OBSOLETE) 1 usually ships 1-5 days
020 N/A Not available 1 (Battery box) usually ships 3-26 days
025 N/A Not available 1 Black strand usually ships 3-26 days
030 N/A Not available 1 (Fuse cable) usually ships 3-26 days
035 172-2432 Fuse strand set (OBSOLETE) 1 usually ships 1-5 days
040 272-8362 Fuse 10 amp 1 usually ships 13-16 days
041 272-2703 Circuit motor vacuum 1 usually ships 1-5 days
049 172-1857 Micro switch (OBSOLETE) 1 usually ships 13-16 days
050 272-2721 Cable with battery plug (OBSOLETE) 1 usually ships 13-16 days
055 991-2102 50amp charger plug SB50 only (red) 1 usually ships 13-17 days
060 172-2431 Fuse cover 1 usually ships 1-5 days
061 272-2572 30amp circuit breaker 1 usually ships 13-16 days

Wiring System 3

#PartDescription ReqNotesAvailability
001 272-2722 Snap switch 1 usually ships 1-5 days
002 272-2693 Clamp (OBSOLETE) 1 usually ships 13-16 days
003 999-0738 Screw M3-.5 x 16mm pan head phillips zinc 2 usually ships 11-14 days
005 272-2694 Control panel harness (OBSOLETE) 1 usually ships 1-5 days
010 172-2420 Terminal block 3 usually ships 1-5 days
015 N/A Not available 1 Turbine cable, included with ref# 052 usually ships 3-26 days
016 272-1906 Terminal block (OBSOLETE) 1 usually ships 1-5 days
020 N/A Not available 1 (Brush motor cable) usually ships 3-26 days
031 172-2424 Electronic board (OBSOLETE) 1 usually ships 13-16 days
034 172-2425 Gasket (OBSOLETE) 1 usually ships 1-5 days
035 N/A Not available 1 (Cover assembly) usually ships 3-26 days
036 N/A Not available 4 (Screw) usually ships 3-26 days
037 272-5509 Electronic cover card 1 usually ships 13-16 days
038 272-2710 Batteries selector 1 usually ships 1-5 days
040 272-2705 Battery status led 1 usually ships 1-5 days
041 172-2399 Terminal block (OBSOLETE) 1 usually ships 1-5 days
045 N/A Not available 1 (Machine harness) usually ships 3-26 days
050 272-2717 Electronic support system (OBSOLETE) 1 usually ships 1-5 days
051 181-0965 Contactor (OBSOLETE) 2 usually ships 13-16 days
053 272-2718 Wet gel label (OBSOLETE) 1 usually ships 1-5 days
054 172-2430 Spacer (OBSOLETE) 1 usually ships 1-5 days

Wiring System 4

#PartDescription ReqNotesAvailability
005 N/A Not available 4 (Insulator cap) usually ships 3-26 days
006 N/A Not available 1 (Black strand) usually ships 3-26 days
007 172-2437 Red strand (OBSOLETE) 1 usually ships 1-5 days
010 272-5517 Battery spacer 1 usually ships 13-16 days
015 172-2436 Lead cable (OBSOLETE) 1 usually ships 1-5 days
020 N/A Not available 1 (Battery box) usually ships 3-26 days
025 N/A Not available 1 Black strand usually ships 3-26 days
030 N/A Not available 1 (Fuse cable) usually ships 3-26 days
035 N/A Not available 1 (Circuit breaker wire assembly) usually ships 3-26 days
041 272-2703 Circuit motor vacuum 1 usually ships 1-5 days
045 272-2724 Plug (OBSOLETE) 1 usually ships 1-5 days
046 272-2725 Plug (OBSOLETE) 1 usually ships 1-5 days
050 272-2721 Cable with battery plug (OBSOLETE) 1 usually ships 13-16 days
055 991-2102 50amp charger plug SB50 only (red) 1 usually ships 13-17 days
060 172-2431 Fuse cover 1 usually ships 1-5 days
061 272-2572 30amp circuit breaker 1 usually ships 13-16 days