Cabinet Assembly

#PartDescription ReqNotesAvailability
3 350-0361 Reed Switch - ISI 1 usually ships 17-24 days
5a 350-0642 Leg 4 inch 1/2-13 Thread                                     4 usually ships 17-24 days
7 350-0035 Bi Metal Thermometer 1.5 inch                                1 usually ships 17-24 days
8 350-1505 Liquid Level Switch SS 1 usually ships 17-24 days
9 350-1232 Band Sump Heater 115V 1 usually ships 17-24 days

Control Panel Assembly

#PartDescription ReqNotesAvailability
2 350-1208 10-32 Lock Nut 2 usually ships 17-24 days
3 350-1279 #10 Brass Washer 2 usually ships 17-24 days
4 350-1189 Switch Guard (Undercounter Units) 1 usually ships 17-24 days
5 350-1822 Power Rocker Switch Red 115V 1 usually ships 17-24 days
6 350-1185 Primer Switch Push Button 4 usually ships 17-24 days
7 350-1186 Push Button Switch Rubber Boot 4 usually ships 17-24 days
8 350-0198 Control Box Light .5 inch Dia Red 115V/60                    1 usually ships 1-5 days
9 350-0322 Toggle Switch DPDT Momentary 1 usually ships 17-24 days

Door Assembly

#PartDescription ReqNotesAvailability
1 350-1323 L-1C-NST Door 1 usually ships 17-24 days
2 350-0603 10-32 x 3/8 Truss Head Screw 2 usually ships 17-24 days
3 350-1325 L-1C-NST Door Handle 1 usually ships 17-24 days
4 350-1321 L-1C Door Spring Arm 2 usually ships 17-24 days
5 350-1322 Energy Mizer L-1C Door Spring 2 usually ships 17-24 days
6 350-0363 Reed Switch Magnet Only - ISI 1 usually ships 17-24 days
7 350-0570 8-32 x 1/2 Panhead Screw 1 usually ships 17-24 days
9 350-0876 UC 50e door rod slide 2 usually ships 17-24 days

Drain Assembly

#PartDescription ReqNotesAvailability
1 350-1229 Pump Hose 6.5 inch V->P                                      2 usually ships 17-24 days
2 350-1118 Hose Clamp Size #16  1 inch 8 usually ships 17-24 days
4 350-1129 Goose Neck Drain Hose 1 inch                                 1 usually ships 17-24 days
5 350-1142 Transfer Hose 90Deg 1 inch                                   1 usually ships 17-24 days
6 350-1235 Sump Screen (GL-X, L-1C) 1 usually ships 17-24 days
7 350-2112 1 inch MPT x 1 inch Barb PVC Sch 80                          1 usually ships 1-5 days

Drain Valve Assembly

#PartDescription ReqNotesAvailability
1 350-0008 Drain Motor 115V (2006) 1 usually ships 17-24 days
2 350-1219 Drain Valve Spring 1 usually ships 17-24 days
3 350-1225 Drain Valve Drive Pin 1 usually ships 17-24 days
4 350-1224 Drain Valve Washer (Thin) SS (OBSOLETE) 1 usually ships 17-24 days
5a 350-1222 Drain Valve Seal Washer -Rubber 1 usually ships 17-24 days
5b 350-1226 Drain Seal Bearing (White Washer) 1 usually ships 17-24 days
6 350-1243 Drain Valve Cover Plate-3 Port 1 usually ships 17-24 days
8 350-1240 Drain Valve Hinge/Seal Fluorocarbon 1 usually ships 17-24 days
9 350-1220 Drain Valve Housing Gasket 1 usually ships 17-24 days
10 350-1238 Drain Valve Housing w/Brass Inserts 1 usually ships 17-24 days
11 350-1241 Screw #6-32 X 0.625 Flanged Hex 2 usually ships 17-24 days
12 350-1242 Screw - #6-32 X 1.5 inch Flanged Hex                         2 usually ships 17-24 days
13 350-1239 Valve Cover Assy - Rectangular 1 usually ships 17-24 days

Electrical Panel Assembly

#PartDescription ReqNotesAvailability
1 350-0195 Motor Contactor 115V 20 Amp SP 1 usually ships 17-24 days
2 350-0444 120V ice cube relay 1 usually ships 17-24 days
3 350-0579 6-32 PM Nut 10 usually ships 17-24 days
4 350-0618 6-32 x 1 Phillips Panhead Screw 2 usually ships 17-24 days
5 350-1819 Power Block 3 Position 1 usually ships 17-24 days
6 350-0565 6-32 x 1/2 SS Panhead Screw 8 usually ships 17-24 days
8a 350-0214 Timer 2 Min 8 Cam 115V/60Hz 1 usually ships 17-24 days
8b 350-0227 Micro Switch 8 usually ships 17-24 days
8c 350-0339 Timer Motor 2 Min 1 usually ships 17-24 days
9 350-1170 Counter - Panel Mount 115V/60Hz 1 usually ships 17-24 days
10 350-0331 Delimer Switch DPDT 20 Amp 2 Pos 1 usually ships 17-24 days
11 350-0323 Toggle Switch Rubber Boot 2 usually ships 17-24 days

Peristaltic Pump Assembly

#PartDescription ReqNotesAvailability
1 350-0237 Peri Pump Motor 50RPM 115V/60Hz 3 usually ships 17-24 days
2 350-0240 Peristaltic Pump Block (Black) 3 usually ships 17-24 days
3 350-0582 10-32 x 1 1/2 Panhead Bolt 6 usually ships 17-24 days
5 350-0595 Twist Tye 7 1/2 inch                                         6 usually ships 17-24 days
6 350-0241 Peristaltic Pump Cover 7 usually ships 17-24 days
7 350-0570 8-32 x 1/2 Panhead Screw 12 usually ships 17-24 days
8 350-1098 Squeeze Tube Norprene 8 inch 3 usually ships 17-24 days
9 350-0242 Peristaltic Pump Rotor Assy 3 usually ships 17-24 days
10 350-0305 Male Barrel Connector 16-14 Gauge 6 usually ships 17-24 days
11 350-0264 Chem Tubing Blue (50 Ft/ Coils) 1 usually ships 17-24 days
12 350-0265 Chem Tubing Red (50 Ft / Coils) 1 usually ships 17-24 days
14 350-1172 Chemical Tube Bulkhead 2 usually ships 17-24 days
15 350-0299 Tube Stiffener 2 usually ships 17-24 days
16 350-0234 Peri Pump Assy 50 RPM 115V/60Hz 1 (includes 1-4 and 6-10) usually ships 17-24 days
17 350-1173 Sani Bulkhead Fitting Assy 1 usually ships 17-24 days
18 350-1101 Squeeze Tube 22 inch Norprene For L-1X 1 usually ships 17-24 days
19 350-0261 Rotor Spacer 1 usually ships 17-24 days

Plumbing Assembly

#PartDescription ReqNotesAvailability
1 350-1201 1/2 Vac Breaker Repair Kit Watts 1 usually ships 17-24 days
2 350-1202 Vacuum Breaker 1/2 inch 1 usually ships 17-24 days
3 350-0475 1/2 Jamb Nut Thin Pattern 2 usually ships 17-24 days
4 350-0504 5/8 Compression Fitting Nut 2 usually ships 17-24 days
5 350-0496 Sprinkler Head Assembly 1/2 inch NPT                         1 usually ships 17-24 days
6a 350-1274 L-1C inchU inch Tube                                        1 usually ships 17-24 days
6b 350-1275 L-1X16 inchU inch Tube                                      1 usually ships 17-24 days
7 350-0471 1/2 Ball Check Valve 1 usually ships 17-24 days
8 350-2225 1/2 x 2 1/2 braided hose 1 usually ships 17-24 days
9 350-0103 1/2 Comp x 3/8 MIP Adapter 1 usually ships 17-24 days
10 350-0483 Solenoid Coil JE 115V (3/4 &1/2) 4 usually ships 17-24 days
11 350-0466 1/2 Water Solenoid Repair Kit JE 1 usually ships 17-24 days
12 350-1191 1/2 Water Sol Valve JE120/60 1 usually ships 17-24 days
13 350-0491 1/2 90Deg Street Elbow 1 usually ships 17-24 days
14 350-0499 5/8 Comp x 1/2 MIP Adapter 6 usually ships 17-24 days
15a 350-1277 L-1X inchL inch Tube                                        1 usually ships 17-24 days
15b 350-1278 L-1X16   inchL inch Tube                                     1 usually ships 17-24 days
16 999-0609 Nut 1/4-20 hex stainless steel 1 usually ships 11-14 days
17 350-0589 1/4 SS Washer 1 usually ships 17-24 days
18 350-0480 1/2 Plumbing Strap SS 1 usually ships 17-24 days
19 350-0493 Nipple Brass 1/2 x 5 1 usually ships 17-24 days
20 350-1190 1/2 Y Strainer 1 usually ships 17-24 days
21 350-2062 1/2 Strainer Ball Valve NPT 1 usually ships 17-24 days
22 350-0485 3/4 Vac Breaker Cap SS 1 usually ships 17-24 days
23 350-1203 1/2 Vac Breaker Bonnet Brass Watt 1 usually ships 17-24 days
24 350-0490 Tee 1/2 C x 1/2 C x 1/2 Male 1 usually ships 17-24 days
25 350-0487 Nipple Brass 1/2 x 1 1/2 1 usually ships 17-24 days
27 350-1193 1/2 Water Solenoid Bonnet 1 usually ships 17-24 days
28 350-0508 Water Sol Plunger 'G' JE 3/4 &1/2 1 usually ships 17-24 days
29 350-2063 1/2 Ball Valve Strainer Only 1 usually ships 17-24 days
32 350-0505 5/8 Compression Fitting Ring 2 usually ships 17-24 days
33 350-1773 Plumbing Bracket 1 usually ships 17-24 days
34 350-1119 Hose Clamp #4 Size #002 SS 1 usually ships 17-24 days
35 350-0603 10-32 x 3/8 Truss Head Screw 1 usually ships 17-24 days
36 350-1210 10-32 KEPS Lock Nut 1 usually ships 17-24 days

Pump Assembly

#PartDescription ReqNotesAvailability
1 350-0589 1/4 SS Washer 4 usually ships 17-24 days
2 350-0562 1/4-20 x 1/2 Hexhead Bolt 4 usually ships 17-24 days
3 350-0072 Wash Motor 1 Hp 115/208-230V 60Hz 1 usually ships 17-24 days
4 350-0616 3/8-16 x 1 1/2 SS Stud 2 usually ships 17-24 days
5 350-1162 Pump O-Ring Gasket 1 usually ships 17-24 days
6 350-0089 Impeller Closed Domestic 4 inch SS                           1 usually ships 1-5 days
8 350-0584 3/8-16 x 3/4 SS Hexhead Bolt 8 usually ships 17-24 days
9 350-0093 Pump Seal Kit (11/07) 1 usually ships 17-24 days
10 350-0060 Pump Assy L-1C 115/220V 60Hz 1 usually ships 1-5 days
12 350-0098 Slip Joint Nut O-Ring Gasket Buna 1 usually ships 17-24 days
13 350-0103 1/2 Comp x 3/8 MIP Adapter 1 usually ships 17-24 days
14 350-0097 Slip Joint Nut Friction Ring Plastic 1 usually ships 17-24 days
15 350-1245 Compression Nut 2.5 inch                                     1 usually ships 17-24 days
16 350-0108 3/8 Male Plug - Sq Head 1 usually ships 1-5 days
17 350-2112 1 inch MPT x 1 inch Barb PVC Sch 80                          1 usually ships 1-5 days

Sani Alarm Assembly

#PartDescription ReqNotesAvailability
1 350-0184 Conduit 3/8 Sealtite 3 usually ships 1-5 days
2 350-0187 St-3/8 Straight Connector 1 usually ships 1-5 days
3 350-0189 St-3/8 90Deg Connector 1 usually ships 1-5 days
4 350-0198 Control Box Light .5 inch Dia Red 115V/60                    1 usually ships 1-5 days
8 350-0594 Twist Tye 4 1/2 inch                                         5 usually ships 17-24 days
9 350-1369 Sanitizer Alarm Box  4 inch x 4 inch x 2 inch                1 usually ships 17-24 days
10 350-1370 Chemical Low Level Vacuum Switch 1 usually ships 17-24 days
11 350-1371 Sanitizer Alarm Buzzer 115V 1 usually ships 17-24 days
14 350-0279 Y Hose Connector 3/16 Single Rib 1 usually ships 17-24 days

Spray Assembly

#PartDescription ReqNotesAvailability
1 350-0573 1/4-20 Nylon Lock Nut 8 usually ships 17-24 days
2 350-0589 1/4 SS Washer 16 usually ships 17-24 days
4 350-1255 Square Manifold Gasket 2 usually ships 17-24 days
5 350-1253 Red Silicone Gasket 1/16Thick 2 usually ships 17-24 days
6 350-1251 Spray Arm Bearing (L-1X/GL-X) 2 usually ships 17-24 days
7 350-0135 Spray Arm Short (B/L-1X/L-1X-16) 2 usually ships 17-24 days
8 350-0155 Spray Arm End Plug SS 4 usually ships 17-24 days
9 350-1118 Hose Clamp Size #16  1 inch 6 usually ships 17-24 days
14 350-1137 Transfer Hose 1 inch Reinforced 2 inch                       2 usually ships 17-24 days
15 350-1130 Transfer Hose 1 inch Reinforced (PER FT)                     2 usually ships 17-24 days
16 350-0148 Spray Arm Assy L-1X/GL-X/L-1C Compte 1 usually ships 1-5 days