Cabinet Assembly

#PartDescription ReqNotesAvailability
1 350-1706 Universal CMA-44/EST Stand 1 usually ships 17-24 days
2a 350-1736 EST-44 Pan L>R (Zoppas) 1 usually ships 17-24 days
2b 350-1735 EST-44 Pan R>L (Zoppas) 1 usually ships 17-24 days
3a 350-1704 EST-44 Wrapper L>R 1 usually ships 17-24 days
3b 350-1705 EST-44 Wrapper R>L 1 usually ships 17-24 days
4a 350-0736 Door - Conveyor Service - L>R Holes 1 usually ships 17-24 days
4b 350-0735 Door - Conveyor Service R>L Holes 1 usually ships 17-24 days
5 350-1672 Wrapper Shield New Style 2 usually ships 17-24 days
6 350-0790 EZ Glide Door Guide SS 21 1/8 2 usually ships 17-24 days
7 350-0448 EZ Glide Door Guide Sq 21 7/8 inch 2 usually ships 17-24 days
8 350-1694 Door Latch Bracket 1 usually ships 17-24 days
9 350-0356 Door Handle 1 usually ships 17-24 days
10 350-0561 1/4-20 x 1/2 Trusshead Bolt 28 usually ships 17-24 days
11 350-0589 1/4 SS Washer 61 usually ships 17-24 days
12 350-0573 1/4-20 Nylon Lock Nut 53 usually ships 17-24 days
13a 350-1681 EST-44 Tray Track RH (4-13) 2 usually ships 17-24 days
13b 350-1682 EST-44 Tray Track LH (4-13) 2 usually ships 17-24 days
14 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 8 usually ships 17-24 days
15 350-1707 EST-44 Heater Cover 2 usually ships 17-24 days
16 350-1715 Strainer Basket EST44 (3 inch deep)                          2 usually ships 17-24 days
17 350-1693 Drip Chute Wide (Feb 2012) 1 usually ships 17-24 days
18 350-1584 Drip Chute Gasket (Wider) 1 usually ships 17-24 days
21 350-1636 Open Door Latch 1 usually ships 17-24 days
22 350-0816 Scrap Trap Body (Universal) SS 1 usually ships 17-24 days
23 350-1968 EST Scrap Trap Holder 1 usually ships 17-24 days
24 350-0818 Scrap Trap Drawer (Universal) 1 usually ships 17-24 days
25 350-1689 CMA 44 Splash Shield (09) 304SS 1 usually ships 17-24 days
26 350-0363 Reed Switch Magnet Only - ISI 1 usually ships 17-24 days
27 350-0361 Reed Switch - ISI 1 usually ships 17-24 days
28 350-1691 Splash Shield Clip 2 usually ships 17-24 days
30 350-0607 8-32 x 1 1/2 Panhead Screw 1 usually ships 17-24 days
31 350-0591 8-32 Nylon Lock Nut 1 usually ships 17-24 days
33 350-1638 Conveyor Door Stop 1 usually ships 17-24 days
34 350-0714 EST-44 Support Bracket Tray Track 2 usually ships 17-24 days
36 350-0666 Adjustable Foot w/SS Toe 4 usually ships 17-24 days
37 350-1713 Strainer Basket Wash/Rinse EST44/66 1 usually ships 17-24 days
38 350-1695 Door Latch Bracket with Nut 1 usually ships 17-24 days
N/S 350-2232 Operating requirement decal 1 usually ships 17-24 days
N/S 350-2233 Detergent and rinse pump 1 usually ships 17-24 days

Control Box Assembly - 1 Phase

#PartDescription ReqNotesAvailability
1 350-0308 Lock - Keyless 1 usually ships 17-24 days
2 350-1444 Fuse 3 Amp 250V Slow Blow 2 usually ships 17-24 days
5 350-0589 1/4 SS Washer 8 usually ships 17-24 days
6 350-1711 EST-Control Box Legs 4 usually ships 17-24 days
7 350-1390 Contactor 75 Amp 3 Pole 1 usually ships 17-24 days
8 350-1389 Contactor 60 Amp 3 Pole 1 usually ships 17-24 days
9 350-1408 Overload 0.63/1.0 220V EST 1pH Broth 1 usually ships 17-24 days
10 350-1401 Mini Contactor 220V 20 Amp 4 usually ships 17-24 days
11 350-1496 Ground Block 1 usually ships 17-24 days
13 350-1143 Thermometer (Capillary) 2 usually ships 17-24 days
14 350-1406 Overload Relay 1.6 to 2.5 Power Rinse 1 usually ships 17-24 days
15 350-0323 Toggle Switch Rubber Boot 1 usually ships 17-24 days
16 350-1396 Toggle Switch SPDT 20 Amp 1 usually ships 17-24 days
17 350-0312 8 Pole Socket Terminal Block 1 usually ships 17-24 days
18 350-1818 Power Block 1 usually ships 17-24 days
19 350-0257 Power Rocker Switch Red 250V 1 usually ships 17-24 days
20 350-1394 CMA-44 Starter Din Rail 1 usually ships 17-24 days
21 350-1712 EST-44 /66 Control Box Lid 1 usually ships 17-24 days
22 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
23 350-1395 Din Rail Mounting Bracket 2 usually ships 17-24 days
24 350-1480 3 1 usually ships 17-24 days
25 350-1402 Surge Absorber MOV 200-240VAC 3 usually ships 17-24 days

Control Box Assembly - 3 Phase

#PartDescription ReqNotesAvailability
1 350-0308 Lock - Keyless 1 usually ships 17-24 days
2 350-1444 Fuse 3 Amp 250V Slow Blow 2 usually ships 17-24 days
5 350-0589 1/4 SS Washer 8 usually ships 17-24 days
6 350-1711 EST-Control Box Legs 4 usually ships 17-24 days
7 350-1389 Contactor 60 Amp 3 Pole 2 usually ships 17-24 days
8 350-1405 Overload Relay 0.4/0.63 220V EST Conv 1 usually ships 17-24 days
9 350-1401 Mini Contactor 220V 20 Amp 4 usually ships 17-24 days
10 350-1496 Ground Block 1 usually ships 17-24 days
12 350-1143 Thermometer (Capillary) 2 usually ships 17-24 days
13 350-1406 Overload Relay 1.6 to 2.5 Power Rinse 1 usually ships 17-24 days
14 350-0323 Toggle Switch Rubber Boot 1 usually ships 17-24 days
15 350-1396 Toggle Switch SPDT 20 Amp 1 usually ships 17-24 days
16 350-0312 8 Pole Socket Terminal Block 1 usually ships 17-24 days
17 350-1818 Power Block 1 usually ships 17-24 days
18 350-0257 Power Rocker Switch Red 250V 1 usually ships 17-24 days
19 350-1394 CMA-44 Starter Din Rail 1 usually ships 17-24 days
20 350-1712 EST-44 /66 Control Box Lid 1 usually ships 17-24 days
21 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
22 350-1395 Din Rail Mounting Bracket 2 usually ships 17-24 days
23 350-1480 3 1 usually ships 17-24 days
24 350-1402 Surge Absorber MOV 200-240VAC 3 usually ships 17-24 days

Control Box Assembly - 480V

#PartDescription ReqNotesAvailability
1 350-1679 Transformer Box 1 usually ships 17-24 days
2 350-1495 Transformer 480V - 240V 1 usually ships 17-24 days
3 350-1443 Fuse Holder - Inline 2 usually ships 17-24 days
4 350-1446 Fuse 1.25 Amp 230V Slow Blow 2 usually ships 17-24 days
5 350-1442 Fuse 1.50 Amp 480V Slow Blow 2 usually ships 17-24 days
6 350-1483 Fuse Clip 2-Poll, Pressure Plate 1 usually ships 17-24 days
7 350-1680 Transformer Box Lid 1 usually ships 17-24 days
8 350-0603 10-32 x 3/8 Truss Head Screw 4 usually ships 17-24 days

Curtain and Optional Vent Assembly

#PartDescription ReqNotesAvailability
1 350-1689 CMA 44 Splash Shield (09) 304SS 1 usually ships 17-24 days
2 350-1640 Curtain CMA-44 20 5/8 inch x 15                              2 usually ships 17-24 days
3 350-2222 Hood adapter 2 usually ships 17-24 days
4 350-1675 Outer Wrap Shield Curtain Support 2 usually ships 17-24 days
5 350-1652 Curtain Rod Short 2 usually ships 17-24 days
6 350-1653 Curtain Rod Long 2 usually ships 17-24 days
7 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 4 usually ships 17-24 days
8 350-1673 Wash Curtain Support ('07) (CMA-44) 2 usually ships 17-24 days
9 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
10 350-1642 Curtain CMA-44 24 5/8 inch x 11 1/2 inch                     1 usually ships 17-24 days

Door Switch Assembly - After July 2014

#PartDescription ReqNotesAvailability
1 350-0326 EST-44/66 Door Safety Switch Brkt 1 usually ships 17-24 days
2 350-1497 Table Limit Switch (Push Button) 1 usually ships 17-24 days
3 350-0327 EST-44/66 Door Switch Actuator Brkt 1 usually ships 17-24 days

Drain System Assembly

#PartDescription ReqNotesAvailability
1 350-1387 Conveyor 44 Drain Manifold 1 usually ships 17-24 days
2 350-2028 Fisher Waste Valve 2 usually ships 17-24 days
3 350-0678 CMA-180 1 1/2 x 2 No Hub 2 usually ships 17-24 days
5 350-2111 Hose Clamp #28 SS 2 usually ships 1-5 days
6 350-0573 1/4-20 Nylon Lock Nut 2 usually ships 17-24 days
7 350-0589 1/4 SS Washer 4 usually ships 17-24 days
9 350-0562 1/4-20 x 1/2 Hexhead Bolt 2 usually ships 17-24 days

E-Temp Heater Assembly - Optional - After August 2018

#PartDescription ReqNotesAvailability
1 350-1616 Booster Heater 1/2 In/Out Adapter 1 usually ships 17-24 days
2 350-0499 5/8 Comp x 1/2 MIP Adapter 3 usually ships 17-24 days
4 350-1629 1/2 inch MIP Plug Brass Sq. Head                             1 usually ships 17-24 days
5 350-0488 1/2 Tee F x F x F Brass 1 usually ships 17-24 days
6 350-1725 E-Temp Booster Shroud - Zoppas 1 usually ships 17-24 days
7 350-1726 E-Temp Booster Access Cover 1 usually ships 17-24 days
8 350-1817 Red Silicone Heater Gasket 2 usually ships 17-24 days
9 350-1723 E-Temp Tank Plug 1 usually ships 17-24 days
10 350-0589 1/4 SS Washer 6 usually ships 17-24 days
11 350-0573 1/4-20 Nylon Lock Nut 6 usually ships 17-24 days
12 350-1943 Hi Limit Switch 250 Deg 1 usually ships 17-24 days
13 350-2046 1/4 Comp x 1/4 MIP Fitting 1 usually ships 17-24 days
14 350-1474 Heater Thermostat (EGO) 1 usually ships 17-24 days
15 350-1484 Immersion Heater 240V/12kW T-Flange 1 usually ships 17-24 days
16 350-1727 E-Temp Heater Tank W/Gaskets 1 usually ships 17-24 days
17 350-0257 Power Rocker Switch Red 250V 1 usually ships 17-24 days

E-Temp Heater Assembly - Optional - Before September 2018

#PartDescription ReqNotesAvailability
1 350-1616 Booster Heater 1/2 In/Out Adapter 1 usually ships 17-24 days
2 350-2036 1/2MPT x 1/2 Hose Barb Straight 2 usually ships 17-24 days
3 350-1120 Hose Clamp #6 Size #003 4 usually ships 17-24 days
5 350-1725 E-Temp Booster Shroud - Zoppas 1 usually ships 17-24 days
6 350-1726 E-Temp Booster Access Cover 1 usually ships 17-24 days
7 350-1817 Red Silicone Heater Gasket 2 usually ships 17-24 days
8 350-1723 E-Temp Tank Plug 1 usually ships 17-24 days
9 350-0589 1/4 SS Washer 6 usually ships 17-24 days
10 350-0573 1/4-20 Nylon Lock Nut 6 usually ships 17-24 days
11 350-1943 Hi Limit Switch 250 Deg 1 usually ships 17-24 days
12 350-2046 1/4 Comp x 1/4 MIP Fitting 1 usually ships 17-24 days
13 350-1474 Heater Thermostat (EGO) 1 usually ships 17-24 days
14 350-1484 Immersion Heater 240V/12kW T-Flange 1 usually ships 17-24 days
15 350-1727 E-Temp Heater Tank W/Gaskets 1 usually ships 17-24 days
16 350-0257 Power Rocker Switch Red 250V 1 usually ships 17-24 days

Plumbing System Assembly - Auto Fill

#PartDescription ReqNotesAvailability
1 350-1202 Vacuum Breaker 1/2 inch 1 usually ships 17-24 days
2 350-0254 6-32 x 1/4 SS Panhead Screw 2 usually ships 17-24 days
3 350-0485 3/4 Vac Breaker Cap SS 1 usually ships 17-24 days
4 350-0499 5/8 Comp x 1/2 MIP Adapter 2 usually ships 17-24 days
6 350-2061 1/2 90Deg Ell F x F Brass 2 usually ships 17-24 days
7 350-0487 Nipple Brass 1/2 x 1 1/2 3 usually ships 17-24 days
8 350-0493 Nipple Brass 1/2 x 5 1 usually ships 17-24 days
9 350-2062 1/2 Strainer Ball Valve NPT 1 usually ships 17-24 days
10 350-1192 1/2 Solenoid Valve JE 240V/50/60Hz 1 usually ships 17-24 days
11 350-0484 Solenoid Coil JE 220V (3/4 & 1/2) 1 usually ships 17-24 days
12 350-1193 1/2 Water Solenoid Bonnet 1 usually ships 17-24 days
13 350-0508 Water Sol Plunger 'G' JE 3/4 &1/2 1 usually ships 17-24 days
14 350-0466 1/2 Water Solenoid Repair Kit JE 1 usually ships 17-24 days
16 350-0491 1/2 90Deg Street Elbow 1 usually ships 17-24 days
17 350-2063 1/2 Ball Valve Strainer Only 1 usually ships 17-24 days
18 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
19 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
20 350-0756 Plumbing Bracket inchU inch Clamp                           2 usually ships 17-24 days
21 350-1203 1/2 Vac Breaker Bonnet Brass Watt 1 usually ships 17-24 days
22 350-1201 1/2 Vac Breaker Repair Kit Watts 1 usually ships 17-24 days

Plumbing System Assembly - Final Rinse

#PartDescription ReqNotesAvailability
1 350-1202 Vacuum Breaker 1/2 inch 1 usually ships 17-24 days
2 350-0254 6-32 x 1/4 SS Panhead Screw 2 usually ships 17-24 days
3 350-0485 3/4 Vac Breaker Cap SS 1 usually ships 17-24 days
4 350-0499 5/8 Comp x 1/2 MIP Adapter 2 usually ships 17-24 days
5a 350-1609 EST-44 Final Rinse PlumbingTube 1 usually ships 17-24 days
5b 350-1610 EST-44 Final Rinse Plumbing Tube 1 usually ships 17-24 days
6 350-1164 1/8 Male Plug 2 usually ships 17-24 days
7 350-1633 Mixing Chamber SS (7-08) 1 usually ships 17-24 days
8 350-0487 Nipple Brass 1/2 x 1 1/2 3 usually ships 17-24 days
10 350-1630 EST Final Rinse Vacuum Breaker Conn 1 usually ships 17-24 days
11 350-1437 EST-44/66 Final Rinse Tube Assy 1 usually ships 17-24 days
12 350-1624 Mixing Chamber Plumbing Connection 1 usually ships 17-24 days
13 350-0035 Bi Metal Thermometer 1.5 inch                                1 usually ships 17-24 days
14 350-1192 1/2 Solenoid Valve JE 240V/50/60Hz 1 usually ships 17-24 days
15 350-0466 1/2 Water Solenoid Repair Kit JE 1 usually ships 17-24 days
16 350-0508 Water Sol Plunger 'G' JE 3/4 &1/2 1 usually ships 17-24 days
17 350-1193 1/2 Water Solenoid Bonnet 1 usually ships 17-24 days
18 350-0484 Solenoid Coil JE 220V (3/4 & 1/2) 1 usually ships 17-24 days
19 350-1598 1/2 x 1/4 Bushing Brass 1 usually ships 17-24 days
20 350-1601 Pressure Gauge CMA-180UC/EST Conv 1 usually ships 17-24 days
21 350-0491 1/2 90Deg Street Elbow 3 usually ships 17-24 days
22 350-1597 Pressure Regulator 1/2 1 usually ships 17-24 days
24 350-1621 Nipple SS 1/2 x Close 3 usually ships 17-24 days
25 350-0756 Plumbing Bracket inchU inch Clamp                           2 usually ships 17-24 days
26 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
27 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
28 350-1203 1/2 Vac Breaker Bonnet Brass Watt 1 usually ships 17-24 days
29 350-1201 1/2 Vac Breaker Repair Kit Watts 1 usually ships 17-24 days

Power Rinse Pump Assembly

#PartDescription ReqNotesAvailability
1 350-1526 Pump Head 1 usually ships 17-24 days
2 350-1527 Impeller 1 usually ships 17-24 days
3 350-1528 Seal Kit 1 usually ships 17-24 days
4 350-1529 Pump O-Ring 1 usually ships 17-24 days
5 350-1530 Back Plate 1 usually ships 17-24 days
7 350-1531 Capacitor 1 usually ships 17-24 days
8 350-1532 Cover 1 usually ships 17-24 days
9a 350-1524 Power Rinse Pump Assy 1ph 208-240 60 1 usually ships 17-24 days
9b 350-1533 Final Rinse Motor Assy 480V 1 usually ships 17-24 days
10 350-1118 Hose Clamp Size #16  1 inch 4 usually ships 17-24 days
11 350-1136 Transfer Hose 1 inch Reinforced 35 inch                      1 usually ships 17-24 days
12 350-1135 Transfer Hose 1 inch Reinforced 3 1/2 inch                   1 usually ships 17-24 days
14 350-0562 1/4-20 x 1/2 Hexhead Bolt 3 usually ships 17-24 days
15 350-0587 1/4 Lock Star Washer 6 usually ships 17-24 days
16 350-0573 1/4-20 Nylon Lock Nut 3 usually ships 17-24 days

Rinse Temperature Control Assembly

#PartDescription ReqNotesAvailability
1 350-1143 Thermometer (Capillary) 1 usually ships 17-24 days
2a 350-1461 Screw Plug Heater 3kW 208-240V 1 usually ships 17-24 days
2b 350-1729 Screw Plug Heater 3kW 480V EST-44/66 1 usually ships 17-24 days
3 350-1511 EST-44/66 Dual Float Switch 1 usually ships 17-24 days
4 350-1475 Heater Thermostat 1 usually ships 17-24 days
5 350-0458 O-Ring Gasket 1 usually ships 17-24 days
6 350-1716 Float Switch Box 1 usually ships 17-24 days
7 350-1718 EST-44/66 Float Switch Box (3-16) 1 (includes N/S) usually ships 17-24 days
N/S 350-1719 EST-44/66 Float Box Mount (3-16) 1 usually ships 17-24 days

Rocker Arm Assembly

#PartDescription ReqNotesAvailability
1a 350-1592 EST-44 Conveyor Dr Assy 60Hz 208-480 11 usually ships 17-24 days
1b 350-1593 EST-44 Conveyor Dr Assy 220V 1pH 1 usually ships 17-24 days
2a 350-1522 EST-44 Gearbox Motor Assy - Brother 1 usually ships 17-24 days
2b 350-1523 EST-44 Gearbox Assy 1pH 230V 1 usually ships 17-24 days
3 350-1539 EST-44 Drive Cam 1 usually ships 17-24 days
5 350-1543 Cam Bearing Only 1 usually ships 17-24 days
6 350-1655 5/16-18 Nylon Insert Lock Nut 1 usually ships 7-10 days
7 350-1542 Cam Bearing Shaft Spacer 1 usually ships 17-24 days
8 350-2228 Cam bearing shaft 1 usually ships 17-24 days
11 350-1563 Rocker Arm Spacer 2 usually ships 17-24 days
12 350-1557 7/8 ID External Lock Ring 2 usually ships 17-24 days
13 350-1558 1 inch ID Brass Washer                                       2 usually ships 17-24 days
14 350-1556 Rocker Shaft Bearing 1 usually ships 17-24 days
15 350-1559 Bearing Shaft (CMA-44) 1 usually ships 17-24 days
16 350-0587 1/4 Lock Star Washer 2 usually ships 17-24 days
17 350-0575 1/4-20 x 3/4 Hexhead Bolt 4 usually ships 17-24 days
18 350-1658 1/2-13 x 3 1/2 Hexhead Bolt 1 usually ships 17-24 days
19 350-1659 1/2-13 Nylon Insert Lock Nut 1 usually ships 17-24 days
20 350-0573 1/4-20 Nylon Lock Nut 1 usually ships 17-24 days
21 350-1573 Conveyor Bar (11 Dogs) (EST-44) 1 usually ships 17-24 days
22 350-1576 15.59 11 usually ships 17-24 days
23 350-1570 Left Conveyor Bar Brkt (CMA-44) 1 usually ships 17-24 days
24 350-1571 Right Conveyor Bar Brkt (CMA-44) 1 usually ships 17-24 days
25 350-1580 Conveyor Bar Slide Bearing HDPE 1 usually ships 17-24 days
26 350-1579 Conveyor Dog Bearing 11 usually ships 17-24 days
27 350-1656 3/8 Nylon Insert Lock Nut 11 usually ships 17-24 days
29 350-0589 1/4 SS Washer 2 usually ships 17-24 days
30 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 2 usually ships 17-24 days
31 350-0559 1/4-20 x 1 3/4 SS Hexhead Bolt 1 usually ships 17-24 days
32 350-1536 Cam Guide (CMA-44P) 1 usually ships 17-24 days
33 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
34 350-1555 Heavy Duty Clutch Spring 1 usually ships 17-24 days
36 350-1581 Conveyor Bar Guide (11-02) 1 usually ships 17-24 days
37 350-1545 Cam Bearing Assy For EST Models 1 usually ships 17-24 days
38 350-1582 Conveyor Bar Guide CMA-66 (1/11) 1 usually ships 17-24 days

Start and Rinse Switch Assembly

#PartDescription ReqNotesAvailability
2 350-0567 6-32 x 3/8 Pan Head Screw 4 usually ships 17-24 days
3 350-0363 Reed Switch Magnet Only - ISI 1 usually ships 17-24 days
5 350-0361 Reed Switch - ISI 1 usually ships 17-24 days
6 350-1453 Final Rinse Reed Switch Bracket 1 usually ships 17-24 days
7 350-0610 6-32 Nylon Insert Lock Nut 4 usually ships 17-24 days
8 350-0589 1/4 SS Washer 4 usually ships 17-24 days
9 350-0562 1/4-20 x 1/2 Hexhead Bolt 4 usually ships 17-24 days
10 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
11 350-1448 Actuator Arm Shaft 1 usually ships 17-24 days
12 350-1655 5/16-18 Nylon Insert Lock Nut 2 usually ships 7-10 days
13 350-1449 Reed Switch Actuator Bracket 1 usually ships 17-24 days

Start Switch and Rinse Assembly -Left Side - After May 2014

#PartDescription ReqNotesAvailability
1 350-0360 Switch Cord 18 AWG SOOW 8 feet usually ships 17-24 days
2 350-0379 Connector-#562 Door Roller Switch 2 usually ships 17-24 days
3 350-0374 Roller Door Switch 2 usually ships 17-24 days
4 350-1450 Switch Bracket Spring 2 usually ships 17-24 days
5 350-1743 Conveyor Switch Housing L>R 2 usually ships 17-24 days
6 350-1745 Conveyor Switch Activator Brkt L>R 2 usually ships 17-24 days
7 350-1738 Conveyor Switch Rod Sleeve 2 usually ships 17-24 days
8 350-1739 Conveyor Switch Rod L>R 2 usually ships 17-24 days
9 350-1741 Conveyor Switch Rod Block UHMW 2 usually ships 17-24 days
10 350-1740 Final Rinse Rod Shield 1 usually ships 17-24 days
11 350-0607 8-32 x 1 1/2 Panhead Screw 2 usually ships 17-24 days
12 350-0573 1/4-20 Nylon Lock Nut 10 usually ships 17-24 days
13 350-0590 5/16 SS Washer 20 usually ships 17-24 days
14 350-0591 8-32 Nylon Lock Nut 4 usually ships 17-24 days
15 350-0574 5/16-18 SS Nut 2 usually ships 17-24 days
16 350-1212 5/16 External Lock Washer 4 usually ships 17-24 days
17 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 6 usually ships 17-24 days
18 350-0569 1/4-20 x 1 1/2 SS Hexhead Bolt 4 usually ships 17-24 days

Start Switch and Rinse Assembly -Right Side - After April 2014

#PartDescription ReqNotesAvailability
1 350-0360 Switch Cord 18 AWG SOOW 8 feet usually ships 17-24 days
2 350-0379 Connector-#562 Door Roller Switch 2 usually ships 17-24 days
3 350-0374 Roller Door Switch 2 usually ships 17-24 days
4 350-1450 Switch Bracket Spring 2 usually ships 17-24 days
5 350-1742 Conveyor Switch Housing R>L 2 usually ships 17-24 days
6 350-1744 Conveyor Switch Activator Brkt R>L 2 usually ships 17-24 days
7 350-1738 Conveyor Switch Rod Sleeve 2 usually ships 17-24 days
8 350-1737 Conveyor Switch Rod R>L 2 usually ships 17-24 days
9 350-1741 Conveyor Switch Rod Block UHMW 2 usually ships 17-24 days
10 350-1740 Final Rinse Rod Shield 1 usually ships 17-24 days
11 350-0607 8-32 x 1 1/2 Panhead Screw 2 usually ships 17-24 days
12 350-0573 1/4-20 Nylon Lock Nut 10 usually ships 17-24 days
13 350-0590 5/16 SS Washer 20 usually ships 17-24 days
14 350-0591 8-32 Nylon Lock Nut 4 usually ships 17-24 days
15 350-0574 5/16-18 SS Nut 2 usually ships 17-24 days
16 350-1212 5/16 External Lock Washer 4 usually ships 17-24 days
17 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 6 usually ships 17-24 days
18 350-0569 1/4-20 x 1 1/2 SS Hexhead Bolt 4 usually ships 17-24 days

Table Limit Switch Assembly

#PartDescription ReqNotesAvailability
11 350-1498 Connector for Table Limit Switch 1 usually ships 17-24 days
2 350-0302 Ring Eyelet Connector 14-16 #8 2 usually ships 17-24 days
3 350-0360 Switch Cord 18 AWG SOOW 14 feet usually ships 17-24 days
7 350-1501 Table Limit Switch Bumper 1 usually ships 17-24 days
9 350-1215 10-32 Lock Star Washer 2 usually ships 17-24 days
10 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 2 usually ships 17-24 days
11 350-0613 1/4 Split Lock Washer 2 usually ships 17-24 days
12 350-0589 1/4 SS Washer 2 usually ships 17-24 days
13 350-0573 1/4-20 Nylon Lock Nut 2 usually ships 17-24 days
14 350-1497 Table Limit Switch (Push Button) 1 usually ships 17-24 days
15 350-1450 Switch Bracket Spring 1 usually ships 17-24 days
16 350-1500 Table Limit Switch Bracket Ass'y 1 usually ships 17-24 days

Wash Pump Assembly - 1 Phase

#PartDescription ReqNotesAvailability
1 350-0072 Wash Motor 1 Hp 115/208-230V 60Hz 1 usually ships 17-24 days
2 350-1247 Pump Base Stainless Steel 1 usually ships 17-24 days
3 350-0093 Pump Seal Kit (11/07) 1 usually ships 17-24 days
4 350-1162 Pump O-Ring Gasket 1 usually ships 17-24 days
5 350-1154 Impeller (Open) SS 1 usually ships 17-24 days
6 350-1248 Pump Cover Stainless Steel 1 usually ships 17-24 days
7 350-0098 Slip Joint Nut O-Ring Gasket Buna 1 usually ships 17-24 days
8 350-1245 Compression Nut 2.5 inch                                     1 usually ships 17-24 days
9 350-1698 Motor Support Bracket - Conveyors 1 usually ships 17-24 days
10 350-0562 1/4-20 x 1/2 Hexhead Bolt 3 usually ships 17-24 days
11 350-0587 1/4 Lock Star Washer 6 usually ships 17-24 days
12 350-0573 1/4-20 Nylon Lock Nut 3 usually ships 17-24 days
13 350-0584 3/8-16 x 3/4 SS Hexhead Bolt 8 usually ships 17-24 days
14 350-1667 7/16-20 Thin Pattern Lock Nut 1 usually ships 17-24 days
15 350-0108 3/8 Male Plug - Sq Head 2 usually ships 1-5 days
16 350-1273 35Deg Elbow MIP X Barb SS 1 usually ships 17-24 days
18 350-0097 Slip Joint Nut Friction Ring Plastic 1 usually ships 17-24 days
19 350-1213 3/8 External Lock Star Washer 2 usually ships 17-24 days
21 350-0616 3/8-16 x 1 1/2 SS Stud 2 usually ships 17-24 days

Wash Pump Assembly - 3 Phase

#PartDescription ReqNotesAvailability
1 350-0083 Wash Motor 1 Hp 3pH 220/460V 60Hz 1 usually ships 1-5 days
2 350-1247 Pump Base Stainless Steel 1 usually ships 17-24 days
3 350-0093 Pump Seal Kit (11/07) 1 usually ships 17-24 days
4 350-1162 Pump O-Ring Gasket 1 usually ships 17-24 days
5 350-1154 Impeller (Open) SS 1 usually ships 17-24 days
6 350-1248 Pump Cover Stainless Steel 1 usually ships 17-24 days
7 350-0098 Slip Joint Nut O-Ring Gasket Buna 1 usually ships 17-24 days
8 350-1245 Compression Nut 2.5 inch                                     1 usually ships 17-24 days
9 350-1698 Motor Support Bracket - Conveyors 1 usually ships 17-24 days
10 350-0562 1/4-20 x 1/2 Hexhead Bolt 3 usually ships 17-24 days
11 350-0587 1/4 Lock Star Washer 6 usually ships 17-24 days
12 350-0573 1/4-20 Nylon Lock Nut 3 usually ships 17-24 days
13 350-0584 3/8-16 x 3/4 SS Hexhead Bolt 8 usually ships 17-24 days
14 350-1667 7/16-20 Thin Pattern Lock Nut 1 usually ships 17-24 days
15 350-0108 3/8 Male Plug - Sq Head 2 usually ships 1-5 days
16 350-1273 35Deg Elbow MIP X Barb SS 1 usually ships 17-24 days
17 350-0069 Motor Assy 1Hp 3pH 220/460V 60Hz 1 usually ships 17-24 days
18 350-0097 Slip Joint Nut Friction Ring Plastic 1 usually ships 17-24 days
19 350-1213 3/8 External Lock Star Washer 2 usually ships 17-24 days
21 350-0616 3/8-16 x 1 1/2 SS Stud 2 usually ships 17-24 days

Wash System Assembly

#PartDescription ReqNotesAvailability
1 350-1432 Spray Arm End Cap CMA/EST44&66 6 usually ships 17-24 days
3 350-1441 CMA-44/66P Socket Bracket Single 2 usually ships 17-24 days
4 350-1419 Spray Arm EST 44/66 6 usually ships 17-24 days
6 350-1439 1/2 Brass Cap 2 usually ships 17-24 days
7 350-1430 EST-44 HT Final Rinse Spray Arm SS 2 usually ships 17-24 days
8 350-1614 Coupling 1/2 316 SS 2 usually ships 17-24 days
9 350-0476 1/2 Jamb Nut Standard 4 usually ships 17-24 days
10 350-1437 EST-44/66 Final Rinse Tube Assy 1 usually ships 17-24 days
11 350-1414 EST Conveyor Wash Manifold (3-15) 1 usually ships 17-24 days
12 350-1417 EST-44 Rinse Manifold R>L 1 usually ships 17-24 days
14 350-0576 1/4-20 x 5/8 Hexhead Bolt 304SS 36 usually ships 17-24 days
15 350-0589 1/4 SS Washer 36 usually ships 17-24 days
16 350-0573 1/4-20 Nylon Lock Nut 36 usually ships 17-24 days
17 350-1424 Long Support Bracket 1 usually ships 17-24 days
18 350-1433 End Cap Shoulder Bolt 12 usually ships 17-24 days
21 350-1136 Transfer Hose 1 inch Reinforced 35 inch                      1 usually ships 17-24 days
22 350-1427 EST-44 Spray Jet SS For High Temp 8 usually ships 17-24 days
23 350-0106 1 inch Compression Gasket                                    1 usually ships 1-5 days

Wash Temperature Control Assembly - Square Flange

#PartDescription ReqNotesAvailability
1a 350-1472 Immersion Heater 10kW 380V 3Hp/1pH 1 usually ships 17-24 days
1b 350-1473 Immersion Heater 10kW 240V 3pH 1 usually ships 17-24 days
2 350-1511 EST-44/66 Dual Float Switch 1 usually ships 17-24 days
3 350-1475 Heater Thermostat 1 usually ships 17-24 days
4 350-1143 Thermometer (Capillary) 1 usually ships 17-24 days
5 350-1463 Heater Mounting Bracket 1 usually ships 17-24 days
6 350-1466 Wash Tank Heater Gasket CMA -180 1 usually ships 17-24 days
7 350-0557 5/16-18 x 1 Hexhead Bolt 4 usually ships 7-10 days
8 350-1655 5/16-18 Nylon Insert Lock Nut 4 usually ships 7-10 days
9 350-0590 5/16 SS Washer 8 usually ships 17-24 days

Wash Temperature Control Assembly - Triangular Flange

#PartDescription ReqNotesAvailability
1a 350-1486 Immersion Heater 12kW 480V T-Flange 1 usually ships 17-24 days
1b 350-1490 Immersion Heater 10kW 208V T-Flange 1 usually ships 17-24 days
1c 350-1492 Immersion Heater 13kW 208V T-Flange 1 usually ships 17-24 days
2 350-1511 EST-44/66 Dual Float Switch 1 usually ships 17-24 days
3 350-1475 Heater Thermostat 1 usually ships 17-24 days
4 350-1143 Thermometer (Capillary) 1 usually ships 17-24 days
5 350-1817 Red Silicone Heater Gasket 1 usually ships 17-24 days
6 350-0575 1/4-20 x 3/4 Hexhead Bolt 4 usually ships 17-24 days
7 350-0589 1/4 SS Washer 8 usually ships 17-24 days
8 350-0573 1/4-20 Nylon Lock Nut 4 usually ships 17-24 days
9 350-1716 Float Switch Box 1 usually ships 17-24 days
10 350-1718 EST-44/66 Float Switch Box (3-16) 1 usually ships 17-24 days

Water Tempering Valve Kit - Optional

#PartDescription ReqNotesAvailability
1 350-0184 Conduit 3/8 Sealtite 2 usually ships 1-5 days
2 350-0187 St-3/8 Straight Connector 1 usually ships 1-5 days
3 350-0189 St-3/8 90Deg Connector 1 usually ships 1-5 days
4 350-0487 Nipple Brass 1/2 x 1 1/2 1 usually ships 17-24 days
5 350-1118 Hose Clamp Size #16  1 inch 1 usually ships 17-24 days
6 350-1123 Braided Hose 1/2 inch                                        5 usually ships 17-24 days
7 350-1192 1/2 Solenoid Valve JE 240V/50/60Hz 1 usually ships 17-24 days
8 350-2061 1/2 90Deg Ell F x F Brass 1 usually ships 17-24 days
10 350-1517 Adapter PVC 1/2 Male x 1/2 Barb 1 usually ships 17-24 days
12 350-1773 Plumbing Bracket 1 usually ships 17-24 days
13 350-0484 Solenoid Coil JE 220V (3/4 & 1/2) 1 usually ships 17-24 days
14 350-2062 1/2 Strainer Ball Valve NPT 1 usually ships 17-24 days