- Commonly Asked For Parts

#PartDescription ReqNotesAvailability
01 230-0277 Smooth grind diamond blade (yellow) usually ships 1-5 days
02 230-0278 Quick diamond blade (blue) usually ships 1-5 days

- Pad Holders

#PartDescription ReqNotesAvailability
1 991-2214 Center-Lok II pad holder - left hand thread (red) usually ships 14-24 days
2a 991-2201 Center-Lok II pad holder - right hand thread (black) (Pad driver side female, Floor side male) usually ships 13-17 days
2b 991-8577 Pad retainer (Pad driver side male, Floor side female) usually ships 13-17 days
3a 991-2202 Big mouth pad holder set (blue) (includes 3 screws) usually ships 14-24 days
3b 991-2205 Deep lock ring and pad grip ring usually ships 17-22 days
4 991-2203 Big mouth pad holder male thread portion usually ships 17-22 days
5 991-2206 Center-Lok 3 pad holder (includes 3 screws) usually ships 13-17 days
6 996-0372 Big mouth pad holder (left hand thread) usually ships 14-24 days
7 N/A Not available usually ships 3-26 days
8 991-2209 Split retainer - pad holder ring (OBSOLETE) usually ships 13-17 days
9 N/A Not available (replaced by #3 991-2202) usually ships 3-26 days
10 991-2211 Center lock pad holding cup (male) (yellow) (OBSOLETE) usually ships 17-22 days

- Pads

#PartDescription ReqNotesAvailability
01 255-0838 8 inch EHD Extra Heavy Duty Concrete Leveling Pad (pkg of 2) usually ships 32-33 days
02 255-0847 8 inch Redwood maroon floor prep pad (pkg of 10) usually ships 32-33 days
04 255-9514 8 inch Diamond by Gorilla 11000 Grit (pkg of 2) usually ships 32-33 days
05 255-9511 8 inch Diamond by Gorilla 1500 Grit (pkg of 2) usually ships 32-33 days
06 255-9508 8 inch Diamond by Gorilla 200 Grit (pkg of 2) usually ships 32-33 days
07 255-9512 8 inch Diamond by Gorilla 3000 Grit (pkg of 2) usually ships 32-33 days
08 255-9509 8 inch Diamond by Gorilla 400 Grit (pkg of 2) usually ships 32-33 days
09 255-9510 8 inch Diamond by Gorilla 800 Grit (pkg of 2) usually ships 32-33 days
10 255-9513 8 inch Diamond by Gorilla 8000 Grit (pkg of 2) usually ships 32-33 days
11 255-0824 8 inch Tiger carpet bonnet (pkg of 2) usually ships 32-33 days

Solution Tank Kit - NON-OEM

#PartDescription ReqNotesAvailability
000a 209-0013 4 gallon solution tank kit for round handle side x sides 1 (includes 001-018) usually ships 14-24 days
000b 209-0014 4 gallon solution tank kit for square handle side x sides 1 usually ships 14-24 days
000c 209-0017 2 1/2 gallon solution tank kit (OBSOLETE) 1 usually ships 13-16 days
001 209-0033 Cap (black) 1 usually ships 14-19 days
002 209-0034 Brass handle rod (OBSOLETE) 1 usually ships 13-16 days
003 209-0035 1/8 inch grommet 1 usually ships 13-16 days
004 N/A Not available 1 (Tank only) usually ships 3-26 days
005 209-0036 Solution valve 1 (includes 006 and 007) usually ships 13-16 days
006 N/A Not available 1 (Washer) usually ships 3-26 days
007 209-0038 Nut 1/4 brass pipe thread straight 1 usually ships 13-16 days
008 209-0039 Hose barb 1/4 1 usually ships 13-16 days
009 209-0040 Hose 3/8 x 24 inch 1 usually ships 13-16 days
010 209-0041 Coupling 1/8 brass 1 usually ships 13-16 days
011 209-0042 1/8 inch brass nipple                                        1 usually ships 13-16 days
012 209-0043 Washer 1/8 brass 2 usually ships 13-16 days
013 209-0044 Nut 1/8 brass lock (OBSOLETE) 1 usually ships 13-16 days
014 209-0045 Hose assembly (OBSOLETE) 1 (includes 009-013) usually ships 13-16 days
015 209-0046 5/16 inch u bolt 2 (only used for round handle buffers) usually ships 13-16 days
016 209-0047 Washer bar 2 usually ships 13-16 days
017 999-0069 Nut 5/16-18 hex 2 usually ships 11-14 days
018 209-0049 U bolt assembly (set of 2) 1 (only used for round handle side x sides) (includes 015-017) usually ships 13-16 days
019 209-0051 Advance adapter U-bolts assembly (set of 2) (OBSOLETE) 1 usually ships 13-16 days