AH-2 Solid Bowl Assembly - Optional

#PartDescription ReqNotesAvailability
1 350-0701 Solid Bowl Control Box 1 usually ships 17-24 days
2 350-0706 Solid Bowl Control Box Lid 1 usually ships 17-24 days
3 350-0702 Solid Bowl Box Slide-Out Tray 1 usually ships 17-24 days
4 350-0316 Beta Solid Bowl DM #W6000 2 usually ships 17-24 days
5 350-0204 Timer 90 Sec 8 Cam 115V/60Hz 1 usually ships 17-24 days
6 350-0195 Motor Contactor 115V 20 Amp SP 2 usually ships 17-24 days
7 350-0443 Timer Relay 120V 1 usually ships 17-24 days
8 350-0444 120V ice cube relay 1 usually ships 17-24 days
9 350-1170 Counter - Panel Mount 115V/60Hz 1 usually ships 17-24 days
10 350-0237 Peri Pump Motor 50RPM 115V/60Hz 1 usually ships 17-24 days
11 350-0240 Peristaltic Pump Block (Black) 1 usually ships 17-24 days
12 350-0242 Peristaltic Pump Rotor Assy 1 usually ships 17-24 days
13 350-0241 Peristaltic Pump Cover 1 usually ships 17-24 days
14 350-0249 Start/Fill Rocker Switch Amber 115V 1 usually ships 17-24 days
15 350-0374 Roller Door Switch 1 usually ships 17-24 days
16a 350-2053 Solenoid Valve 1/4'' w/Cover 115V 2 usually ships 17-24 days
16b 350-2190 1/4 inch water solenoid valve repair kit 2 usually ships 17-24 days
16c 350-2056 Water Solenoid Coil Only 115V (Dema) 2 usually ships 17-24 days
17 350-0379 Connector-#562 Door Roller Switch 1 usually ships 17-24 days
18 350-0285 Master Switch 20 Amp 1 usually ships 17-24 days
19 350-2191 Electrical bell box 1 usually ships 17-24 days
20a 350-2042 Solid Bowl 1/4 Vac Breaker 2 usually ships 17-24 days
20b 350-2041 1/4 Vac Breaker Bonnet 2 usually ships 17-24 days
20c 350-2040 1/4 Vac Breaker Repair Kit 2 usually ships 17-24 days
21 350-0307 Lock and Key 1 usually ships 17-24 days
22 350-0330 Toggle Switch DPDT 20 Amp/Delimer 1 usually ships 17-24 days
23 350-0323 Toggle Switch Rubber Boot 2 usually ships 17-24 days
24 350-1182 Toggle Switch (Momentary) Screw Term 1 usually ships 17-24 days
25 350-0359 Switch Cord 18 AWG 1 usually ships 17-24 days
26 350-1098 Squeeze Tube Norprene 8 inch 1 usually ships 17-24 days
27 350-2044 1/4 Comp x 1/4 MIP Ell 4 usually ships 17-24 days
28 350-2047 1/4 TB x TB x TB Comp Tee 1 usually ships 17-24 days
29 350-2048 1/4 Comp x 1/8 MIP 90Deg Ell 2 usually ships 17-24 days
30 350-2046 1/4 Comp x 1/4 MIP Fitting 4 usually ships 17-24 days
31 350-0295 3/8 90Deg Ell Comp x MIP 1 usually ships 17-24 days
32 350-2045 77Deg Elbow Bulkhead 2 usually ships 17-24 days
33 350-2043 7/8 To 1 Snap Hose Clamp 2 usually ships 17-24 days
34 350-2192 3/8 inch nylon straight connector (black) 4 usually ships 17-24 days
35 350-0189 St-3/8 90Deg Connector 2 usually ships 1-5 days
36 350-2193 3/8 inch flex tubing (black) 2 feet usually ships 17-24 days
37 350-0582 10-32 x 1 1/2 Panhead Bolt 2 usually ships 17-24 days
38 350-0570 8-32 x 1/2 Panhead Screw 4 usually ships 17-24 days
39 350-2194 1/4 inch water line vacuum breaker to bowl 2 usually ships 17-24 days
40 350-2195 Right hand 1/4 inch water solution to vacuum breaker 1 usually ships 17-24 days
41 350-2196 Left hand 1/4 inch water solution to vacuum breaker 1 usually ships 17-24 days
42 350-2197 Right hand 1/4 inch water line tee to water solution 1 usually ships 17-24 days
43 350-2198 Left hand 1/4 inch water line tee to water solution 1 usually ships 17-24 days
44 350-1271 5/8 ID x 7/8 OD CV Tubing 1 usually ships 17-24 days