SC800 Solution Tank Assembly

#PartDescription ReqNotesAvailability
1 172-4857 Hose clamp 1 usually ships 13-16 days
2 999-0559 Washer 1/2 x 1/4 flat stainless steel 3 (SC750 and SC800) usually ships 11-14 days
3a 272-9891 Solution tank 1 (SC750 and SC750 ST) usually ships 13-16 days
3b 272-9913 Solution tank 1 (SC800 and SC800 ST) usually ships 1-5 days
4 272-9892 Pressure sensing tube 1 (SC750 and SC800) usually ships 1-5 days
5a 272-9893 Drain hose 1 (SC750 and SC750 ST) (before June 2016) usually ships 13-16 days
5b 272-9914 Drain hose 1 (SC800 and SC800 ST) (before June 2016) usually ships 13-16 days
5c 472-8020 HOSE-PVC-5/8X19 1 (after May 2016) usually ships 13-16 days
6 272-9894 Gasket 3 (SC750 and SC800) usually ships 1-5 days
7 997-2103 8 inch cable tie 4 (the quantity of these parts increased by (1 each) and were implemented in production as of November 6th, 2014) usually ships 11-14 days
8a 272-9895 Hose (OBSOLETE) 1 (before June 2016) (hose 272-9895 is obsolete. To replace 272-9895, please order Solution Level Kit 472-4570) usually ships 1-5 days
8b 472-4568 HOSE 1 (after May 2016) (SC750, SC800) (hose 272-9895 is obsolete. To replace 272-9895, please order Solution Level Kit 472-4570) usually ships 13-16 days
9 272-8076 Gasket 1 usually ships 13-16 days
10 170-5402 Manual solution valve 1 usually ships 13-16 days
11 181-0259 Adaptor PP-HS 1 (SC750 and SC800) usually ships 13-16 days
12a 999-1182 Screw M5-.8 x 16mm pan head slotted stainless steel 1 (before June 2016) usually ships 11-14 days
12b 999-9109 Screw M5-.8 x 12mm pan head phillips stainless steel 1 (after May 2016) usually ships 11-14 days
13a 272-9352 Raw cap with tether 1 (before June 2016) usually ships 13-16 days
13b 272-9352 Raw cap with tether 1 (after May 2016) usually ships 13-16 days
14a 272-9896 Straight connector 2 (before June 2016) usually ships 13-16 days
14b 272-9896 Straight connector 2 (after May 2016) usually ships 13-16 days
15 170-1387 Bushing fitting 2 usually ships 13-16 days
16 170-7388 1/4 tab 4 (the quantity of these parts increased by (1 each) and were implemented in production as of November 6th, 2014) usually ships 1-5 days
17 272-8931 Screw M6-1 x 10mm pan head 4 (the quantity of these parts increased by (1 each) and were implemented in production as of November 6th, 2014) usually ships 1-5 days
18 272-9915 Pipe plug 1 (SC750 ST and SC800 ST) usually ships 13-16 days
19 272-9961 Pipe plug 1 (SC800 and SC800 ST) usually ships 13-16 days
20a 997-2005 Hose clamp 1 (before June 2016) usually ships 7-8 days
20b 209-0604 Hose clamp 1 (after May 2016) usually ships 13-16 days
21 472-4569 ELBOW 3/16 X 3/16 POLY 1 (after May 2016) (hose 272-9895 is obsolete. To replace 272-9895, please order Solution Level Kit 472-4570) usually ships 13-16 days
22 472-4567 HOSE 1 (after May 2016) (hose 272-9895 is obsolete. To replace 272-9895, please order Solution Level Kit 472-4570) usually ships 13-16 days
23 999-1129 Screw 1/4-20 x 1/2 pan head phillips thread rolling zinc 2 (after May 2016) usually ships 11-14 days
24 172-9530 Cable clamp 4 (after May 2016) usually ships 1-5 days
25 472-7868 POWER CORD BRACKET 1 (after May 2016) usually ships 13-16 days