| # | Part | Description |
Req | Notes | Availability |
1a |
175-2290
|
Battery cable (red) |
1 |
(5680) |
usually ships 16-21 days |
1b |
275-0732
|
Wire assembly (red) |
1 |
(5700) |
usually ships 16-21 days |
2a |
998-0010
|
Battery jumper cable - ring type (red) |
5 |
|
usually ships 13-17 days |
2b |
991-6025
|
Wire 4 x14.5, 3/8 ring x 3/8 ring |
5 |
(NON-OEM) |
usually ships 13-17 days |
3 |
999-1305
|
Washer M3 split lock stainless steel |
2 |
|
usually ships 11-14 days |
4a |
175-2121
|
Battery terminal cover (clear) |
12 |
(standard) (tall) |
usually ships 16-21 days |
4b |
275-5948
|
Battery terminal cover (black) |
12 |
(optional) (short) |
usually ships 16-21 days |
5 |
175-2122
|
90 degree cable boot |
12 |
|
usually ships 16-21 days |
6 |
175-2123
|
6 gauge battery cable assembly |
1 |
(includes 7) |
usually ships 16-21 days |
7 |
991-2105
|
SB50 50amp charger plug with pins (gray) |
1 |
(5680) |
usually ships 13-17 days |
8 |
175-2127
|
Battery spacer |
3 |
(qty 4 for heavy duty option) |
usually ships 16-21 days |
9 |
175-2128
|
Battery spacer |
1 |
(not used on heavy duty) |
usually ships 16-21 days |
10a |
162-0003
|
6V 225Ah wet battery (SNSR) |
6 |
|
usually ships 25-34 days |
10b |
162-0005
|
6V 305Ah wet battery (SNSR) |
6 |
|
usually ships 25-34 days |
10c |
162-0043
|
6V 224Ah AGM battery (Group GC2) (SNSR) |
6 |
|
usually ships 25-34 days |
10d |
162-0046
|
6V 335Ah AGM battery (Group J305) (SNSR) |
6 |
|
usually ships 25-34 days |
11 |
175-2130
|
Strap |
1 |
|
usually ships 16-21 days |
12 |
999-0768
|
Nut M3-.5 hex coarse thread plain finish |
2 |
|
usually ships 11-14 days |
13 |
999-0211
|
Nut 5/16-18 hex nylon insert lock zinc plated |
12 |
|
usually ships 11-14 days |
14a |
999-1040
|
Screw M3-.5 x 20mm pan head |
1 |
(before SN 9999999) |
usually ships 11-14 days |
14b |
999-1221
|
Screw M3-.5 x 25mm pan head stainless steel |
2 |
(after SN 10000000) |
usually ships 11-14 days |
15 |
175-6295
|
Connector bracket |
1 |
(after SN 10000000) |
usually ships 16-21 days |
16 |
175-6339
|
Switch plate (Tennant Industrial) |
1 |
(after SN 10000000) |
usually ships 16-21 days |
17 |
175-4578
|
Switch kit |
1 |
(after SN 10000000) |
usually ships 16-21 days |
18 |
999-1040
|
Screw M3-.5 x 20mm pan head |
2 |
(after SN 10000000) |
usually ships 11-14 days |
19 |
999-1305
|
Washer M3 split lock stainless steel |
2 |
(after SN 10000000) |
usually ships 11-14 days |
20 |
175-6365
|
Battery tray |
1 |
|
usually ships 16-21 days |
21 |
999-9097
|
Washer M8 flat stainless steel |
12 |
(before SN 9999999) |
usually ships 11-14 days |
22 |
275-0733
|
Wire assembly (red) |
1 |
(5700 after SN 021999) (includes 23) |
usually ships 16-21 days |
23 |
175-6423
|
Connector assembly (OBSOLETE) |
1 |
(5700 after SN 021999) |
usually ships 16-21 days |
24 |
175-2290
|
Battery cable (red) |
1 |
(5700) (before SN 022000) |
usually ships 16-21 days |
25 |
175-2530
|
Battery cable |
1 |
(5700) (before SN 022000) |
usually ships 16-21 days |
26 |
175-9755
|
Battery cap |
6 |
(heavy duty) |
usually ships 1-5 days |
N/S |
375-0041
|
Battery cable |
|
|
usually ships 16-21 days |