Wiring Diagram - Dual Cord

#PartDescription ReqNotesAvailability
E1 172-9141 120V heater 1
H2 209-0671 Light (green) 1
M1a N/A Not available 1 (motor for 300 or 400 PSI) (only available in KIT1)
M1b N/A Not available 1 (100 PSI pump) (only available in KIT2)
M2a 209-0330 120V 3 stage vacuum motor 1 (vac motor 209-0330 replaces vac motor 408G as of 12/29/2014)
M2b 209-0658 Carbon brush kit 1 (for 408G)
P1 209-0672 Hour meter 1
S1 209-0286 On/off switch 3 prong 1 (formerly 4 prong and has been replaced by 3 prong which will work in its place)
S2 209-0286 On/off switch 3 prong 1 (formerly 4 prong and has been replaced by 3 prong which will work in its place)
S3 209-0286 On/off switch 3 prong 1 (formerly 4 prong and has been replaced by 3 prong which will work in its place)
S4 N/A Not available 1 (thermostat)
S5 N/A Not available 1 (part of E1)
KIT1 172-9140 100PSI pump kit 1 (includes M1a)
KIT2 209-0667 Pump kit 1 (includes M1b)