Step | | Procedure & Parts & Tools |
1 |
|
TURN OFF TANK
|
2 |
|
DISCONNECT FUEL LINE
|
3 |
|
OPEN TANK STRAP
|
4 |
|
REMOVE TANK
|
5 |
|
DISCONNECT THE ANDERSON PLUG
|
6 |
|
LOOSEN BOTTOM BOLT AND NUT AND REMOVE TOP BOLT AND NUT
Wrench-Allen standard 3/16 in |
|
Wrench-metric 10mm |
|
|
7 |
|
SLIDE BATTERY BOX AWAY FROM FRAME
|
8 |
|
PULL THE BONNET OFF THE CAGE
|
9 |
|
REMOVE THE 4 ACORN NUTS
Ratchet-Socket metric 10mm |
|
|
10 |
|
LIFT TO REMOVE THE CAGE FROM THE ENGINE
|
11 |
|
LOCATE THE LOCKOFF
|
12 |
|
LOCATE AND PULL TO DISCONNECT THE WIRE CONNECTOR
|
13 |
|
LOCATE AND PULL TO DISCONNECT THE OTHER WIRE CONNECTOR
|
14 |
|
UNSCREW THE LOCKOFF
Wrench-3/16 in |
|
|
15 |
|
THE LOCKOFF IS NOW FREE FROM THE ENGINE
|
16 |
|
UNSCREW BRASS FITTING TO DISCONNECT FUEL LINE FROM THE LOCKOFF. REVERSE STEPS 1 THRU 15 TO REPLACE WITH A NEW LOCKOFF AND TO REASSEMBLE MACHINE. BEFORE INSTALLING A NEW LOCKOFF, WRAP ALL THREADS IN TEFLON TAPE.
Crescent wrench |
|
Wrench-9/16 in |
|
Teflon tape |
|
|